Pinned Tweet
Screenshots from my phone of #OsmAnd set up to use #CyclOSM as a background map + with the Waymarked Trails route lines as an overlay. @ramthelinefeed
Replying to @joncstone
@joncstone (Future C13) cycle tracks on Clerkenwell Rd opened today. bsky.app/profile/maclondon.b…
Pic=One way to use the new infrastructure in a longer route to connect from northbound C6 branch to C41.
I don't think you've gone via the picturesque Doughty Mews (red box) in a video.
MacLondon retweeted
📢 Big News: Romford Road Section H is OPEN! 🚲🚶♂️
We’ve officially hit a major milestone for a greener, safer neighborhood. Section H is now open, featuring dedicated improvements for:
Pedestrians: Wider, safer walkways for a better walking experience.
Replying to @joncstone
@joncstone Some bits to be aware of:
Some recent contraflows introduced in Fitzrovia (red circles).
The orange box has one sign (pic 3) <inconvincingly> suggesting that it currently has a contraflow.
I suspect C27 will get realigned via Gt Titchfield St (TfL map uses this).
First section of C43 (red box) is now signed, although might need another day's work to complete the road markings and properly sign the contraflow on Portsea Place.
Drawings also suggest a couple of islands will come at the north end of the 2 contraflow streets.
Purple=C-links
Some suggestions for @FootwaysLondon in Hackney: (1) There are some missing sections of a signed pedestrian/cycle route between Finsbury Park + Victoria Park (delivered for 2012 Olympics) - cycling.waymarkedtrails.org/…
It might be better to map this @FootwaysLondon route via the staggered pelican crossing on Mare St + the south side of St Thomas's Sq. The central cycle track on Mare St wasn't designed/intended to be used as pedestrian refuge island.
@FootwaysLondon Hackney have recently installed a new crossing on Mare St.
(Work was related to the relocation of 2 bus stops.)
Views of the most recently completed cycling infrastructure on the Silvertown Way viaduct. @joncstone
youtu.be/njfyYSbD4eY?t=946
All the road changes for the Chatsworth Rd Liveable Neighbourhood have now begun in Hackney. @joncstone @SafeCycleLDN
bsky.app/profile/maclondon.b…
Replying to @joncstone
@joncstone In case you haven't seen them, these are the new monster cycle tracks in Meridian Water, running around 3 sides of the former Ikea.
Mostly built, though not completed yet at the SW corner of IKEA.
@joncstone Some details on the new Cycleway 66 at bsky.app/profile/maclondon.b…
Not yet properly marked etc, but the new (raised) C16 crossing on Olympic Park Ave is now 'open'. @joncstone
bsky.app/profile/maclondon.b…
Replying to @joncstone
@joncstone The North Woolwich Rd cycle tracks are basically finished now, BUT...
Finsbury Park Road... minus Thames Water works!! 😲
@joncstone @EdmondChuiHW
Traffic is fully back onto the roadway on Waterden Rd outside the housing development.
Looks like the planned relocation of the disused zebra crossing near Parkes St junction might finally be under way.
@joncstone @richardavsmith @raynoldchow @EdmondChuiHW
The Red Path's joints are really not ageing well just east of where it passes over one of the A12 carriageways.
Presumably they do carry out safety checks on bridges like this? @EdmondChuiHW
Around Connaught Bridge area.
At the surviving roundabout, the parallel crossing has opened. Final layer is not yet in for the rideable two-way cycle track.
2 errant bollard discs have been corrected... but the last one in video is wrong.
@EdmondChuiHW @joncstone @SafeCycleLDN
Resurfacing (?this week) has delivered the planned parallel crossing on Thames Rd (Silvertown) although Belishas needed activating before it actually opens.
Also within the boxed area on the map (at the former roundabout), the junction with North Woolwich Rd has been raised.
Replying to @joncstone
@joncstone @SafeCycleLDN You should find some useful bits of cycling updates among what I've posted in the last few days at bsky.app/profile/maclondon.b…
@joncstone @SafeCycleLDN Some more updates, including the big new changes on/around Lambeth Bridge at bsky.app/profile/maclondon.b…
Apparently the end of Bodney Rd will open tomorrow.
Give-way markings at both ends of the narrowed ending and at least 1 big 🚲 logo visible, so I expect this is indeed a modal filter.
Estate fencing went in this week & the works compound is largely cleared out now.
@ripley226
The 2 new-ish Silvertown crossings I previously thought were 'incorrect' pelicans have now had their🚦converted to toucan crossings, though they're not yet operational.
@raynoldchow @EdmondChuiHW @richardavsmith @joncstone @hackney_cycling @NewhamCyclists
xitter.cf/MacLondon/status/18612…
Replying to @MacLondon
At southern end of Silvertown Way, at least the (pelican) crossing in pic 1 should be a toucan. @NewhamCyclists
I'd also have expected the pelican crossing in pic 2 to be a toucan, especially for southbound cyclists from Dock Rd.















































































