That's the first filter I use too. If the utility letter has a load figure and a date, the rest of the file gets easier to underwrite. If it's still a conversation, I treat the timeline as unknown.
1
6
The one dashboard a CRE brokerage actually needs is four views, not one screen.
1. Pipeline: which deals move today
2. Site demand: who needs power and land, and when
3. Market pulse: what to post, what worked
4. Verification brief: every claim checked against a primary source before it reaches the queue
AI can fill the cells. A human still owns the publish button.
What's on yours?
22
Replying to @JeramyUtara
That's the shift I'm seeing too. Buyers want the utility path, water story, and community file before they sign, not as a diligence item after. Sites that can show all three up front are the ones getting taken seriously.
1
9
79% of site selectors now rank power as a top factor (Site Selectors Guild via CRE Daily). In 2024, workforce was #1. Over half say weak power alone gets a site cut.
Selling land or industrial? Document the power before you list.
credaily.com/briefs/power-ac…
26
Replying to @SnglrtyFarmer
Agreed. The LOI shows the demand is still there. The towns that come out ahead will be the ones that put bill protection and water terms in writing before the next vote, not after.
7
Replying to @sgfcitizen
The detail to watch is the definition. The mayor's amendment defines large load by megawatts, not square footage, and separates IT equipment from other uses. Whatever Springfield adopts Nov. 30, other Missouri cities will likely borrow. Where should the threshold land?
19
Replying to @tylerhnorris @AuroraER_Oxford
Peter Lake's line that SPP was first out of the gates matters for the Plains. If a load that accepts curtailment gets a 60 to 90 day study instead of years, the next question is underwriting: how many tenants will sign curtailment terms into a lease?
50
Replying to @chamath
Same shift is hitting real estate ops. Brokerage workflows are decades of human habits spread across inboxes and spreadsheets. When we rebuilt ours around AI agents, the biggest win wasn't speed. It was the audit trail: every draft logged, a human approving what goes out.
1
26
The market isn't doubting data center demand. It's pricing who can get built.
Yesterday, leased AWS powered shells priced at a 7.0% cap. Today we learn a bank sold its slice of a permit-troubled campus loan in the mid-80s.
Developers: what do your lenders make you prove first?
HSBC sold roughly $300 million of debt tied to Oracle's $ORCL Project Jupiter data center at a steep discount.
The bank sold its $300 million share of the project's $18 billion construction loan for roughly $255 million, about $45 million below face value.
The 2.45 GW campus in New Mexico is part of the Stargate AI infrastructure initiative backed by Oracle, OpenAI and SoftBank. The project has faced local opposition and significant delays in securing air and pipeline permits.
The sale came shortly after Oracle issued a force majeure notice to the developer, a unit of Blue Owl Capital, seeking to delay certain payments if the project is derailed or misses its planned 2028 opening.
About 20 banks participated in the original $18 billion financing. Construction lenders typically hold these loans until projects are completed, making an early sale at such a steep discount noteworthy.
Separately, ING and Société Générale have put up to $800 million of other data center loans up for sale in recent weeks, including exposure to Oracle's Stargate initiative.
Source: Bloomberg, Financial Times.
28
Delay and higher cost, not cancellation. That's what it looks like on the ground in Missouri this week.
Springfield extended its data center pause to Feb. 24. Independence pushed its next vote to December.
Landowners: would you rather get a clear no or a rolling not yet?
AI data-centre: 100% moratorium improbable, modest slowdown likely and it will elongate the cycle (and the selloff has already priced a lot in)
Post-midterm noise has focused on local ballots, state pauses and talk of tighter rules on new data centres. Legitimate friction exists: power, water, permitting and community pushback are real constraints. However, a near-total U.S. halt is improbable as it will send the US into an immediate recession.
AI is a strategic priority; economic and geopolitical costs of freezing buildout are high. Much near-term capacity is already permitted or under construction.
Private land + evolving power solutions (gas, nuclear, efficiency) + international options provide outlets.
No federal ban has material traction; impact is more delay and higher cost than cancellation.
Base case from banks: some 2028 projects slide to 2029. This elongates the AI capex cycle rather than derailing it. Positives include:
1) Smoother supply-demand rebalancing (less boom-bust risk for the supply chain).
2) Better utilisation and pricing power for compute.
3) Improved credit outlook and more sustainable multi-year spending.
4) Hyperscalers still guiding strong near-term capex; and they will likely become FCF +ve
The aggressive selloff in AI infrastructure names (picks-and-shovels, semis, related industrials) has already discounted substantial slowdown risk. Multiples have compressed hard while order books and guidance have stayed firm. This looks more like a positioning/sentiment reset than a fundamental end of the cycle.
Quality AI infrastructure exposure still looks attractive if demand holds. Best to own companies with strong balance-sheets, high margins, FCF and real backlog. alphatarget.com
27
Replying to @JeramyUtara
That's the distinction buyers are paying for. Contracted demand is easy to find. A site with a signed power path and a date you can underwrite is not. Curious what terms you treat as in writing enough to take a site to market.
1
14
Replying to @puckrin
One nuance: per Bloomberg, the sale happened several weeks ago, right after Oracle's force majeure notice, and it's one bank's $300M slice of an $18B loan on a project with permit problems. Reads less like an AI verdict and more like lenders pricing delivery risk.
27
Replying to @onchaincowboy
Congrats on the move, Mason. We have powered sites in the Midwest and partner on larger campuses. Would be glad to hear what Giga is prioritizing on size, power and timing. Mind if I DM you?
1
26
Replying to @JeramyUtara
That's a practical path for neighboring landowners. The campus may take years to energize, but electrical and HVAC vendors need yards and warehouse space much sooner. Have you seen more of those leases signed before vertical construction, or after?
1
13
KCMO's new economic scorecard: population +1.0%, median household income +7.6%, asking rent +4.3%.
But housing permits are down 22.5% and commercial construction costs are up 7.6%.
Demand is growing. Supply isn't. That gap favors owners of existing buildings.
29
Replying to @SnglrtyFarmer
Exactly. An abatement vote without a written benefits agreement leaves the city negotiating after the fact. Payments, hiring, and what happens if the project slips should be on paper before the incentive is locked in.
7
Amazon just told you what a powered shell is worth.
7.0% cap, 12-year triple net leaseback. The scarce part isn't the building. It's the power and the permission to build it.
Developers: is 7% where you'd sell a stabilized powered shell in the Midwest?
AMAZON IS SELLING DATA CENTERS & RENTING THEM BACK
Blackstone's new data center trust is buying a 75% stake in two $AMZN data center campuses valued at about $5 billion. The deal covers 13 newly built data center buildings with 647 megawatts of power capacity, nine in northern Indiana near Chicago and four in Mississippi.
Amazon keeps the other 25% and will lease back all 13 buildings for at least 12 years, with options that can stretch to 32. The price works out to a 7% initial yield, and the rent rises 2.75% a year.
At closing, Amazon gets a cash payout funded by $1.9 billion from Blackstone and about $2.5 billion of new mortgage loans on the buildings. Amazon said the partnership lets it keep expanding as demand grows.
Meta did a version of this last year, when funds run by Blue Owl took an 80% stake in its $27 billion Hyperion data center campus in Louisiana.
It is the first deal for Blackstone Digital Infrastructure Trust, which raised $1.75 billion in its IPO in May. It is expected to close by year-end.
57
Replying to @MendySchech
That's the test. A higher going-in cap rate only helps if the lease still covers debt service with the 10-year near 5%. Curious which property types in your world still pencil on that math.
15
Replying to @DDResearchDesk @chamath
In the Midwest I usually see local approvals move first, then interconnection, then substation equipment, which can sit on a long lead time even after the other two are in motion. The site that wins is working all three at once, not in a line.
1
22
In an 8-deal test, AI got every hard number right and about a quarter of the returns (Avi Hacker).
Let AI pull the rent roll, the T-12 and the tax bill. Rent growth and the exit cap are still judgment calls. That's the job.
avihacker.substack.com/p/cla…