Pradeep Krishnamurthy (@pradeepc_k) header
Pradeep Krishnamurthy (@pradeepc_k) profile picture

ಬನ ವಾಸಿ. Seeker of truth. Here for India's cultural tapestry

Bengaluru
Joined December 2009
Photo by Pradeep Krishnamurthy (@pradeepc_k)Photo by Pradeep Krishnamurthy (@pradeepc_k)Photo by Pradeep Krishnamurthy (@pradeepc_k)Photo by Pradeep Krishnamurthy (@pradeepc_k)Photo by Pradeep Krishnamurthy (@pradeepc_k)Photo by Pradeep Krishnamurthy (@pradeepc_k)Photo by Pradeep Krishnamurthy (@pradeepc_k)Photo by Pradeep Krishnamurthy (@pradeepc_k)Photo by Pradeep Krishnamurthy (@pradeepc_k)Photo by Pradeep Krishnamurthy (@pradeepc_k)
Replying to @Kuma50531Kumar
Hope to see a #NammaMetro line on NICE link road in South #Bengaluru from Deepanjali Nagar covering BEML Layout, residential areas around Uttarahalli road, BSK 6th stage #BrandBengaluru
1
1
5
445
Pradeep Krishnamurthy retweeted
Replying to @Kuma50531Kumar
Hope to see a #NammaMetro line on NICE link road in South #Bengaluru from Deepanjali Nagar covering BEML Layout, residential areas around Uttarahalli road, BSK 6th stage #BrandBengaluru
1
1
5
445
Pradeep Krishnamurthy retweeted
🚨 IndiGo is launching daily direct flights between Bengaluru and Hanoi in Vietnam starting December 20, 2026.
48
194
25
5,921
249,189
Pradeep Krishnamurthy retweeted
BIEC Madavara to Bellandur in 1.45 hrs on a Thursday evening. All thanks to Metro and BMTC. 500 Bus from Bellandur to Silk Board - NM Yellow line from Silk Board to RV - Green line from RV to Madavara and the same reverse. Not more than 5 min wait at each transfer. This is the current cheat code to Bengaluru traffic.
11
18
272
12,100
Govt approves Rs 2,321 crore white-topping project for 131 km of roads across Bengaluru The newly asphalted stretch of Bannerghatta Road is among the 88 roads identified for white-topping in this phase😀 deccanherald.com/india/karna…
18
10
8
87
6,033
Pradeep Krishnamurthy retweeted
Bannerghatta Road is among the 88 roads identified for white-topping under the fourth phase of the project. The 10-km stretch has been allocated Rs 222 crore. The fourth phase will cover 130.85 km of roads across #Bengaluru at a cost of Rs 2,321 crore.
9
7
2
32
3,256
Pradeep Krishnamurthy retweeted
Is GTA 6 actually bad or is the internet just miserable about literally everything?
2,666
169
175
9,584
1,749,899
Pradeep Krishnamurthy retweeted
Bengaluru’s civic governance seems to be in limbo. There appears to be little urgency among elected representatives to push for Councillor elections, while the State Election Commission seems to have limited ability to move things forward. Meanwhile, citizens continue to grapple with potholes, overflowing drains, sewage on roads and garbage on streets. Even those who were once keen to contest and serve as councillors seem to be losing hope. How long must citizens wait for elected local representatives and accountable civic governance? Bengaluru deserves better. #Bengaluru #GBA #CivicGovernance #LocalDemocracy
7
1
17
1,626
Good job in highlighting to central govt, @DKShivakumar @krishnabgowda! Wish our elected like @PCMohanMP & other #Bengaluru MPs had shown even 5% intent to influence #Redline metro.🤦 Absolute apathy in giving infra for #ITCorridor, only forex revenue is the focus! @MALimbavali @CMofKarnataka @osd_cmkarnataka @Tejasvi_Surya @pmoindia @officialbmrcl @mansoorkhaninc #SarjapurRoad #BMRCL
11
27
2
254
29,501
Pradeep Krishnamurthy retweeted
GTA 6 review score roundup: • IGN - 10/10 • VGC - 10/10 • Empire - 5/5 • Forbes - 10/10 • Eurogamer - 5/5 • ComicBook - 5/5 • Digital Spy - 10/10 • TechRadar - 10/10 • GameSpot - 10/10 • ScreenRant - 10/10 • Destructoid - 10/10 • PushSquare - 10/10 • CGMagazine - 10/10 • GamesRadar - 10/10 • DualShockers - 10/10 • Game Informer - 10/10 • EDGE Magazine - 10/10 (Metacritic: 99)
3,849
19,095
10,455
186,571
15,316,818
Pradeep Krishnamurthy retweeted
First thing I tried to do was Wrestle an Alligator in GTA VI 🤣
194
664
109
15,635
1,799,063
Pradeep Krishnamurthy retweeted
The realism of car crashes in GTA 6 is insane.
84
240
24
4,464
1,850,276
Pradeep Krishnamurthy retweeted
Replying to @Tejasvi_Surya
GTA always had a #Bengaluru connection
5
31
439
21,867
Pradeep Krishnamurthy retweeted
GTA 6, one of the most awaited game in the world, has a Bengaluru connection. A significant part of its development has been done by Rockstar India, in this city, by over 1,600 developers What's even more interesting is the story behind it. In 1995, Rajesh Rao started Dhruva Interactive in Bengaluru with just one computer. It went on to become India's first game development studio being acquired by Rockstar Games in 2019. We all know Bengaluru for its IT industry, but it's exciting to discover the many facets of our ecosystem. #GTA6 @RockstarGames
125
894
52
10,858
420,194
Pradeep Krishnamurthy retweeted
🟣 Challaghatta Depot Works #BMRCL #NammaMetro
3
13
279
11,881
Pradeep Krishnamurthy retweeted
Bengaluru currently needs More Metro , More feeder Buses and Walkable streets. People are ready to walk these days. Just we need to provide more and better footpaths!!
Over 33,000 people took a brand-new metro line on its very first working day. Bengaluru had been waiting for this, and it shows why we need to keep building metro lines without stopping. On November 13, Prime Minister Modi Ji opened the first stretch of Namma Metro's Pink Line. This stretch is only 7.5 km long and runs along Bannerghatta Road. It has six stations: Kalena Agrahara, Hulimavu, IIMB, JP Nagar 4th Phase, Jayadeva Hospital and Tavarekere. Tickets cost between ₹10 and ₹30. Then came Monday, November 16. The first normal working day, when people had to get to offices, colleges and hospitals. By 9 pm that day, the line had recorded 33,046 boardings. Which stations were busiest? Jayadeva Hospital was far ahead, with 21,254 boardings. Jayadeva is where the Pink Line meets the Yellow Line, so people can switch trains there and travel much further. After that came Kalena Agrahara with 3,204, SG Palya with 2,465, Hulimavu with 2,439, IIMB with 2,239 and JP Nagar 4th Phase with 1,445. Anyone who's been on Bannerghatta Road knows how painful it can be. Long jams, buses crawling, autos stuck, people losing an hour or more every day. Those 33,000 trips are 33,000 times someone didn't have to sit in that traffic. Some of them left their bike at home. Some skipped a cab. Some were patients or family members heading to Jayadeva Hospital, one of India's biggest heart hospitals, who can now get there without worrying about being stuck on the road. And this happened on day one, before most people even changed their habits. Ridership usually grows for months after a line opens, as people realise it's faster and start planning their lives around it. Also, it's not just this line Namma Metro is now 103.6 km long with 91 stations. It's the second-largest metro network in India, after Delhi. On August 10 this year, it carried 11,19,815 people in a single day, its highest ever. That's more than 11 lakh trips in one day that would otherwise have needed buses, cars, bikes and autos on our already crowded roads. A metro train can carry well over a thousand people. To move the same number by car, you'd need hundreds of cars, each taking up road space, burning fuel and adding to pollution. So every new metro line takes pressure off the roads. And when roads are less crowded, even people who still drive get home faster. Buses move quicker. Ambulances get through. The whole city breathes a little easier. Public transport also makes a city fairer. A good metro means a student, a nurse, a security guard and a software engineer can all get across the city quickly and cheaply. Your commute stops depending on whether you can afford a car. So we need to keep building. The Pink Line isn't finished yet. The 13.8 km underground stretch from Dairy Circle to Nagawara is still being built and is expected to open around 2027. The Blue Line along the Outer Ring Road and to the airport is also under construction. That's the one tech workers in Bellandur, Marathahalli and Whitefield have been waiting for, and it'll finally connect the city to Kempegowda Airport by metro. After that, more lines are planned, including the Red Line from Hebbal to Sarjapur. To be honest, Bengaluru's metro has a history of missing deadlines. This very Pink Line stretch was first expected much earlier. So the push has to stay strong. Faster approvals, quicker land clearance and steady funding matter just as much as the announcements. But imagine the city once the full Pink Line, the Blue Line to the airport and the next lines are running. You could take the metro from south Bengaluru to Nagawara, switch lines, and reach the airport without touching a road. You could live in Electronic City or Kengeri and work in Whitefield without losing three hours a day to traffic. Bengaluru already has pleasant weather for most of the year, great jobs, some of India's best hospitals and colleges, and a culture that welcomes people from every part of the country. In the government's Ease of Living Index in 2020, it was ranked India's most livable big city. What's held it back is traffic. If we fix that Bengaluru can become one of the most livable cities in India and a city that stands alongside places like Singapore, Seoul and Tokyo. Those cities are great because people can move around easily, cheaply and reliably, mostly by train. So let's celebrate this line, and then let's demand the next one, and the one after that. Bengaluru needs to keep building and building and building.
6
9
139
2,238
Pradeep Krishnamurthy retweeted
Over 33,000 people took a brand-new metro line on its very first working day. Bengaluru had been waiting for this, and it shows why we need to keep building metro lines without stopping. On November 13, Prime Minister Modi Ji opened the first stretch of Namma Metro's Pink Line. This stretch is only 7.5 km long and runs along Bannerghatta Road. It has six stations: Kalena Agrahara, Hulimavu, IIMB, JP Nagar 4th Phase, Jayadeva Hospital and Tavarekere. Tickets cost between ₹10 and ₹30. Then came Monday, November 16. The first normal working day, when people had to get to offices, colleges and hospitals. By 9 pm that day, the line had recorded 33,046 boardings. Which stations were busiest? Jayadeva Hospital was far ahead, with 21,254 boardings. Jayadeva is where the Pink Line meets the Yellow Line, so people can switch trains there and travel much further. After that came Kalena Agrahara with 3,204, SG Palya with 2,465, Hulimavu with 2,439, IIMB with 2,239 and JP Nagar 4th Phase with 1,445. Anyone who's been on Bannerghatta Road knows how painful it can be. Long jams, buses crawling, autos stuck, people losing an hour or more every day. Those 33,000 trips are 33,000 times someone didn't have to sit in that traffic. Some of them left their bike at home. Some skipped a cab. Some were patients or family members heading to Jayadeva Hospital, one of India's biggest heart hospitals, who can now get there without worrying about being stuck on the road. And this happened on day one, before most people even changed their habits. Ridership usually grows for months after a line opens, as people realise it's faster and start planning their lives around it. Also, it's not just this line Namma Metro is now 103.6 km long with 91 stations. It's the second-largest metro network in India, after Delhi. On August 10 this year, it carried 11,19,815 people in a single day, its highest ever. That's more than 11 lakh trips in one day that would otherwise have needed buses, cars, bikes and autos on our already crowded roads. A metro train can carry well over a thousand people. To move the same number by car, you'd need hundreds of cars, each taking up road space, burning fuel and adding to pollution. So every new metro line takes pressure off the roads. And when roads are less crowded, even people who still drive get home faster. Buses move quicker. Ambulances get through. The whole city breathes a little easier. Public transport also makes a city fairer. A good metro means a student, a nurse, a security guard and a software engineer can all get across the city quickly and cheaply. Your commute stops depending on whether you can afford a car. So we need to keep building. The Pink Line isn't finished yet. The 13.8 km underground stretch from Dairy Circle to Nagawara is still being built and is expected to open around 2027. The Blue Line along the Outer Ring Road and to the airport is also under construction. That's the one tech workers in Bellandur, Marathahalli and Whitefield have been waiting for, and it'll finally connect the city to Kempegowda Airport by metro. After that, more lines are planned, including the Red Line from Hebbal to Sarjapur. To be honest, Bengaluru's metro has a history of missing deadlines. This very Pink Line stretch was first expected much earlier. So the push has to stay strong. Faster approvals, quicker land clearance and steady funding matter just as much as the announcements. But imagine the city once the full Pink Line, the Blue Line to the airport and the next lines are running. You could take the metro from south Bengaluru to Nagawara, switch lines, and reach the airport without touching a road. You could live in Electronic City or Kengeri and work in Whitefield without losing three hours a day to traffic. Bengaluru already has pleasant weather for most of the year, great jobs, some of India's best hospitals and colleges, and a culture that welcomes people from every part of the country. In the government's Ease of Living Index in 2020, it was ranked India's most livable big city. What's held it back is traffic. If we fix that Bengaluru can become one of the most livable cities in India and a city that stands alongside places like Singapore, Seoul and Tokyo. Those cities are great because people can move around easily, cheaply and reliably, mostly by train. So let's celebrate this line, and then let's demand the next one, and the one after that. Bengaluru needs to keep building and building and building.
The newly opened elevated section of Bengaluru Metro's Pink Line recorded 33,046 boardings on Nov 16 as of 9pm. Jayadeva interchange station recorded the highest boarding at 21,254, followed by Kalena Agrahara (3,204), Hulimavu (2,439), SG Palya (2,465), Bilekahalli-IIMB (2,239) & NS Palya-JP Nagar 4th Phase (1,445). @OfficialBMRCL
1
8
1
15
3,579
Pradeep Krishnamurthy retweeted
After years of overcoming land acquisition and coordination challenges, the Jakkur Railway Overbridge is ready for public use. A long-awaited infrastructure project delivered through sustained effort and coordination, to build a better-connected #BetterBengaluru.
15
28
3
280
19,483
Pradeep Krishnamurthy retweeted
Surat-Chennai Economic Corridor Update from Karnataka State, Package-2 Most of the Sections are completed except the Bhima River Bridge and both interchanges ( 1 at jewargi ). Full Video youtu.be/JpKQfEaYDMk
5
28
1
357
9,513