Sifu retweeted
Personally , anyone talking about generation as the main talking point of our power sector problem shows lack of fundamental understanding of the sector
Liquidity and transmission problems are the biggest issues bedeviling the sector.
Liquidity issues include - pricing for Gas, pricing for power generation and distribution( including infrastructure metering and optimal revenue collection )
Then transmission issue; Nigeria does not have the capacity to wheel above 4,500MW of generated electricity. Extra power generated must either be exported or wasted. This is largely an infrastructure issue.
Niger delta power holding company generate 450MW of electricity ( despite unavailability of gas ) but can only wheel 45MW to the grid.
Zungeru hydropower that we all celebrated capacity is 700MW but only supplies 350MW to the grid.
These are the issues.
We do not currently have the active gas processing, pipeline delivery, or commercial liquidity required to support an additional 10,000 MW of power generation, and delivering it within four years is simply not realistic.
Generating an extra 10,000 MW from gas-fired thermal plants requires roughly 2.0 to 2.5 billion standard cubic feet per day (bscf/d) of additional dedicated gas supply. That would mean nearly doubling Nigeria’s entire current domestic gas supply in 48 months.
First, there is a severe liquidity crisis in the sector. Upstream gas producers have zero appetite for major new domestic investments unless the market fully transitions to a willing-buyer, willing-seller framework and regulated domestic price caps are either removed or adjusted to reflect market realities.
As for Non-Associated Gas (NAG), nobody is committing the billions required to develop deep standalone gas fields under the current commercial regime. Meanwhile, existing production is heavily tied up in NLNG export commitments, and while trunklines like AKK and OB3 are nearing completion, hundreds of kilometers of critical last-mile spur pipelines and processing facilities still need to be built.
On the generation side, our headline "installed capacity" is misleading. Roughly 3,000 MW of our existing fleet is functionally obsolete, and another 2,000 MW sits idle due to deferred maintenance. Owed trillions of naira in legacy market debt, GenCos lack both the financial muscle and the commercial incentive to procure FX for OEM spare parts or replace worn-out turbines.
Beyond generation, the midstream and downstream bottlenecks are just as steep. We still need massive capital for high-voltage transmission expansion to safely wheel an extra 10,000 MW, alongside fixing the deep technical, collection, and infrastructure gaps across the DisCos, all while the industry remains weighed down by trillions of naira in debt.
Give or take, unlocking 10,000 MW all the way to Nigerian homes requires $35 billion to $50 billion in end-to-end capital expenditure. You cannot attract that scale of private capital into a market where tariff subsidies and payment defaults are still the order of the day.
Sifu retweeted
They honestly can't process campaign discussion that is not framed as Gossip.
They can't discuss Methods or Concepts.
They can only discuss People and Stories.
That's a key feature of Low Literacy.
Inability to handle abstract concepts is a key feature of low literacy.
Sifu retweeted
You tell young Nigerians with University Degrees that Nigerian Oil Receipts can't cover Salary demands and they don't feel anything.
You say Party A is Pro-Business& Pro-Devolution while Party B is Statist and inclined towards a Command-Structure and it means nothing to them.
Your conditioning and fitness have to be right to be able to do it
Replying to @htomufc
It is there only in some games and moments. It’s up to players in my opinion. You can’t choose to show intensity in one game and go back to nothing in another. Then the constant switching between styles of play (Amorim to Carrick)
1
54
Easy with the lies bro. Ethiopia does not even know it achieved this
Replying to @fimiletoks
2yrs was enough for Ethiopia to build a 1000mw power plant. B4 tinubu became president he talk about solving the light problem. Show us the 500/1000mw tinubu govt built in 4yrs since one of his campaign is to solve electricity problem.
30
You should read up on the climate change activists campaigning against coal powered plants. The World bank and other lenders won't finance coal plants...
Replying to @fimiletoks
Is gas the only thing that can drive turbines? Have they explored renewable energy sources, like wind, ocean current, and solar (not solar panels), that are way cheaper than gas to power turbines? Have they tried cheaper non-renewable options like coal powered turbines?
17
Replying to @fimiletoks
It’s not as if you can just pick up a natural gas turbine from a warehouse. Those things typically take at least 5 years from order to delivery especially with all the demand from data centres and other competing power generation projects.
Sifu retweeted
We do not currently have the active gas processing, pipeline delivery, or commercial liquidity required to support an additional 10,000 MW of power generation, and delivering it within four years is simply not realistic.
Generating an extra 10,000 MW from gas-fired thermal plants requires roughly 2.0 to 2.5 billion standard cubic feet per day (bscf/d) of additional dedicated gas supply. That would mean nearly doubling Nigeria’s entire current domestic gas supply in 48 months.
First, there is a severe liquidity crisis in the sector. Upstream gas producers have zero appetite for major new domestic investments unless the market fully transitions to a willing-buyer, willing-seller framework and regulated domestic price caps are either removed or adjusted to reflect market realities.
As for Non-Associated Gas (NAG), nobody is committing the billions required to develop deep standalone gas fields under the current commercial regime. Meanwhile, existing production is heavily tied up in NLNG export commitments, and while trunklines like AKK and OB3 are nearing completion, hundreds of kilometers of critical last-mile spur pipelines and processing facilities still need to be built.
On the generation side, our headline "installed capacity" is misleading. Roughly 3,000 MW of our existing fleet is functionally obsolete, and another 2,000 MW sits idle due to deferred maintenance. Owed trillions of naira in legacy market debt, GenCos lack both the financial muscle and the commercial incentive to procure FX for OEM spare parts or replace worn-out turbines.
Beyond generation, the midstream and downstream bottlenecks are just as steep. We still need massive capital for high-voltage transmission expansion to safely wheel an extra 10,000 MW, alongside fixing the deep technical, collection, and infrastructure gaps across the DisCos, all while the industry remains weighed down by trillions of naira in debt.
Give or take, unlocking 10,000 MW all the way to Nigerian homes requires $35 billion to $50 billion in end-to-end capital expenditure. You cannot attract that scale of private capital into a market where tariff subsidies and payment defaults are still the order of the day.
I know a black American who is in the country already...they don't read all that nonsense the stupid obidients write
Is God not wonderful??
Replying to @NigAffairs @woye1
So ExxonMobil a employed Tinubu to the position of Corporate Treasurer without any academic credentials?
15
Sifu retweeted
Go back to where you copied the definition and ask whose responsibility it is to provide PHCs. A classic example that shows acute cluelessness.
How would he even know when he ruled for 7 years without conducting Local Government elections?
This quoted post is unavailable.
Sifu retweeted
To be fair to him, he doesn’t know any better.
He ruled Anambra without Local Government chairmen and that’s all the governance experience he has.
He’s speaking from his lense 🤣