Scheduled power interruption in Camiguin and parts of Misamis Oriental on Sunday, 22 November 2026
Time: 7:00AM – 5:00PM
Affected: CAMELCO and parts of MORESCO 2
Reason: Maintenance activities along Jasaan-Kinoguitan 69kV Line
Specific areas are determined by the affected electric cooperatives. NGCP will exert all efforts to restore power earlier or as scheduled.
#NGCP
1
127
Scheduled power interruption affecting parts of Lanao del Sur, 22 November 2026.
Time: 7:00AM-4:00PM
Affected: LASURECO
Reason: maintenance activities along Basak-Malabang 69kV line segment.
Specific affected areas are determined by the electric cooperative. NGCP will exert all efforts to restore power earlier or as scheduled.
#NGCP
200
Fully restored power transmission service in parts of Lanao del Sur, 18 November 2026, 2:15PM.
Affected: LASURECO
Restored: Basak-Malabang 69kV line segment
Reason: the line outage at 9:27PM on 17 November 2026, remains under investigation to determine its root cause.
Prior to full restoration, power transmission service was partially restored up to the Bacolod-Kalawi areas at 9:44PM on 17 November 2026, and further extended to the Ganassi areas at 8:10AM on 18 November 2026.
NGCP and LASURECO line personnel worked jointly in conducting line inspections and restoration activities, resulting in the full restoration of power transmission service.
#NGCP
1
202
Restored power transmission service in parts of Camarines Sur Province today, 18 November 2025 at 5:26PM
Affected: CASURECO III (Bula, Nabua, and Iriga Substations)
Reason: Shutdown of Naga-Iriga 69kV Line to facilitate maintenance activities along the line
We appreciate your patience and understanding during the power interruption.
#NGCP
1
162
𝐌𝐀𝐍𝐀𝐓𝐈𝐋𝐈𝐍𝐆 𝐋𝐈𝐆𝐓𝐀𝐒
Huwag magtayo ng bahay o anumang istruktura sa ilalim ng mga linya ng kuryente.
Ang pagtatayo ng mga bahay o anumang istruktura sa ilalim ng mga linya ng kuryente ay labis na mapanganib.
Bukod sa maaari itong magdulot ng sunog o pagkakuryente, maaari rin itong makaapekto sa maayos na pagdaloy ng kuryente sa linya na pwedeng magdulot ng mga power interruptions.
Hangad namin ang inyong kaligtasan at kapakanan.
#NGCP
#ngcpsafety
1
211
Scheduled power interruption in parts of Albay on Thursday, 19 November 2026
Time: 6::00AM - 8:00AM
Affected: ALECO (Salvacion Substation and Sta. Misericordia Feeder 1 and Feeder 2)
Reason: Shutdown of Daraga-Sto. Domingo 69kV Line as per request of ALECO to facilitate tapping of their new Daraga (Cullat) Load-End Substation
Specific areas are determined by the affected electric cooperative. NGCP will exert all efforts to restore power earlier or as scheduled.
1
216
Scheduled power interruption in parts of Maguindanao del Sur and Manguindanao del Norte on Sunday, 22 November 2026.
Time: 06:00 AM - 5:00 PM
Affected:
MAGELCO (Talayan Substation)
Time: 06:00 AM - 06:10 AM & 04:50 PM - 05:00 PM
Affected: MAGELCO (Rajah Silongan Kudarat & Salbu Substations)
Reason: Shutdown of Dukay -Talayan 69kV line section to facilitate line repairs
Brief power interruptions are due to isolation and normalization of Salbu-Talayan 69kV line section before and after the scheduled repairs.
Specific affected areas are determined by the electric cooperative. NGCP will exert all efforts to restore power earlier or as scheduled.
#NGCP
205
Scheduled maintenance activities in parts of Cagayan and Kalinga on Saturday, 21 November 2026
Time: 6:15AM – 6:15PM
Affected: Parts of CAGELCO I (Carig, Caritan, Solana and Piat Substations) and KAELCO (Tabuk Substation)
Reason: Upgrading activities at Tuguegarao Substation.
Specific areas are determined by the affected electric cooperatives. NGCP will exert all efforts to restore power earlier or as scheduled.
#NGCP
1
269
Scheduled power interruption in parts of Isabela on Saturday, 21 November 2026
Time: 8:00AM – 12:00NN
Affected: ISELCO I (Reina Mercedes and District 1 Substations) and ISELCO II (Ilagan, Naguilian and San Mariano Substations)
Reason: Implementation of corrective and maintenance activities at Gamu Substation and along Gamu–Cauayan 69kV Line.
Time: 8:00AM – 5:00PM
Affected: ISELCO II (Ilagan – Burgos 13.8kV line)
Reason: Corrective maintenance works at Ilagan Substation
Specific areas are determined by the affected electric cooperatives. NGCP will exert all efforts to restore power earlier or as scheduled.
#NGCP
1
272
Scheduled power interruption affecting parts of Tarlac and Nueva Ecija on Friday, 20 November 2026.
Time: 8:00AM - 5:00PM
Affected: TARELCO I
Reasons: To conduct transmission line maintenance, testing and other technical activities along Concepcion-Camiling 69kV Line and inside substation.
Specific areas are determined by the electric cooperative. NGCP will exert all efforts to restore power earlier or as scheduled.
261
𝐌𝐀𝐍𝐀𝐓𝐈𝐋𝐈𝐍𝐆 𝐋𝐈𝐆𝐓𝐀𝐒 ⚠️
Huwag magparada o magpatakbo ng matataas at malalaking sasakyan malapit sa linya at tore ng kuryente.
Ang pagpaparada o pagmamaneho ng malalaki at matataas na sasakyan malapit sa linya at tore ng kuryente ay maaaring magdulot ng aksidente, pagkamatay at pagkaantala sa daloy ng kuryente sa mga transmission lines at magdulot ng power interruptions.
Kung aksidente namang bumangga ang minamanehong sasakyan sa tore o poste ng kuryente at walang pagkakataon na lumayo mula rito, ipagbigay alam agad sa kinauukulan upang mabigyan ng karampatang tulong o safety assistance.
Maaaring mag-text sa 0917-TIPNGCP (8476427) o 0918-TIPNGCP (8476427).
Hangad namin ang inyong kaligtasan at kapakanan.
#NGCPSafety
#ngcp
239
Scheduled power interruption in parts of Zambales on Friday, 20 November 2026
Affected: ZAMECO I
Time:
5:00AM – 1:00PM (Iba, Salaza, Candelaria and Sta. Cruz Substations)
Reason: Transmission line maintenance along Botolan-Candelaria 69kV line and maintenance of associated substation equipment.
Specific areas are determined by the electric cooperatives. NGCP will exert all efforts to restore power earlier or as scheduled. ###
1
192
Scheduled power interruption in parts of Cagayan and Apayao on Friday, 20 November 2026
Time: 5:30AM – 4:00PM
Affected: CAGELCO I (Alcala Substation) and entire franchise of CAGELCO II
Reason: Implementation of corrective and maintenance activities along Tuguegarao–Magapit- Camalaniugan/ Sta. Ana 69kV Line
Specific areas are determined by the affected electric cooperatives. NGCP will exert all efforts to restore power earlier or as scheduled.
227
Restored power transmission service in parts of General Santos City and Sarangani Province today, 16 November 2026 at 4:22 AM
Time Out: 4:12 AM
Affected: SOCOTECO II (Ligaya, Main Office A&B, Veranza and Malandag Substations)
Reason: Planned shutdown of Gensan-Lledo 69kV Line to facilitate load normalization and transfer back to its original configuration following the completion of preventive maintenance activities.
Specific affected areas are determined by the electric cooperative.
We appreciate your patience and understanding during the scheduled power interruption.
1
193
Power transmission services in Northeastern Mindanao remain stable despite the 5.8 magnitude earthquake that occurred 35 kilometers South East of General Luna, Surigao del Norte at 9:41 PM, 15 November 2026.
The grid remains intact as there had been no reported damaged transmission facilities in Northeastern Mindanao and nearby areas where the earthquake was felt.
264
Scheduled power interruption in parts of Camarines Sur on Wednesday, 18 November 2026
Time: 6:30AM - 6:30PM
Affected: CASURECO III (Bula, Nabua, and Iriga Substations)
Reason: Shutdown of Naga-Iriga 69kV Line to facilitate maintenance activities along the line
Specific areas are determined by the affected electric cooperative. NGCP will exert all efforts to restore power earlier or as scheduled.
268
Restored power transmission service in parts of General Santos City and Sarangani Province today, 15 November 2026 at 4:21 PM.
Time Out: 11:13 AM
Affected: SOCOTECO II (Ligaya, Main Office A&B, Veranza and Malandag Substations)
Reason: Preventive and corrective maintenance and upgrading activities at NGCP Gensan Substation.
Specific affected areas are determined by the electric cooperative.
We appreciate your patience and understanding during the scheduled power interruption.
#NGCP
1
237
Restored power transmission service in parts of Camarines Sur Province today, 15 November 2026 at 5:31PM
Affected: CASURECO I (Pamplona, Libmanan, Sipocot, and Ragay Substations)
Reason: Shutdown of Naga-Libmanan 69kV Line to facilitate preventive maintenance along the line and installation of voltage transformer at Naga Substation
We appreciate your patience and understanding during the power interruption.
1
175
Possible Voluntary Load Curtailment or Rotational Power Interruption
The National Grid Corporation of the Philippines (NGCP) informs the public of a possible load curtailment that will affect parts of General Santos City, South Cotabato and Sarangani Province during the period:
November 15, 2026 | 5:00 PM – 11:00 PM
Affected Substations: New Society, Calumpang, Fishport, Damalerio, Leon Llido, Polomolok, Tupi, Main A & B, Ligaya, and Malandag.
November 23, 2026 | 10:00 AM – 6:00 PM
Affected Substations: New Society, Calumpang, Fishport, Damalerio, and Leon Llido.
Rotational power interruption will only be implemented if SEC Unit 1 isolates or trips during the preventive and corrective maintenance and upgrading activities at General Santos Substation. This contingency measure is necessary to prevent the overloading of NGCP Power Transformers No. 1 and 3 and maintain the stability of the power system.
Specific affected areas are determined by the concerned electric cooperative.
NGCP encourages everyone to exercise prudence in using electricity during these periods to help manage power demand.
Thank you for your understanding and cooperation.