EPS walls, engineered as reinforced concrete. 50% faster builds. Steel mesh + shotcrete reinforced. Book a site tour 👇

Phileo Arcade, Thika Rd, Ruiru
Joined July 2026
Come and see an EPS wall. Touch it and feel the engineering confidence. Chat on WhatsApp: wa.link/t5x8rb
Ask us about building with EPS EPS Technology Chat on WhatsApp: wa.link/t5x8rb
1
Ask us about building with EPS EPS Technology Chat on WhatsApp: wa.link/t5x8rb
1
2
Our technicians understand EPS and are always open to chat. To meet them, VISIT wa.link/l68rn4
You can wave at them Or chat with them, VISIT wa.link/l68rn4
The BOYS!!! You can always meet them, VISIT wa.link/l68rn4
1
Check out the VectorSpace crew! To meet them, VISIT wa.link/l68rn4
2
Ask our engineers how your build would be sequenced: wa.link/l68rn4
This is our EPS slab schedule: Formwork: days 1 to 4 Panel assembly: days 5 to 6 Steel fixing: days 7 to 8 Electrical and plumbing: day 9 Casting: day 10 The fast turnaround should cut down your construction time significantly.
1
2
13
This is our EPS slab schedule: Formwork: days 1 to 4 Panel assembly: days 5 to 6 Steel fixing: days 7 to 8 Electrical and plumbing: day 9 Casting: day 10 The fast turnaround should cut down your construction time significantly.
How long should your slab take? With EPS.. 10 DAYS, formwork to casting.
1
1
2
31
How long should your slab take? With EPS.. 10 DAYS, formwork to casting.
1
1
1
25
A divider wall should not shut your business down for weeks. Bare floor at 12:20. Standing EPS wall by 15:29. Dividing a warehouse, shop or office? Talk to us: wa.link/l68rn4
1
2
30
HAPPY MASHUJAA DAY🇰🇪 Mashujaa are those who build the nation in their capacity. These are our heroes!!
1
1
6
Happy Mashujaa Day🇰🇪
🤖 Made with AI
1
1
8
On a 100 sqm slab, you need 15 m³ of concrete for a conventional slab. But you only need 8.8 m³ for an EPS slab. That is 6.2 m³ less to buy and pour. How much can you save? Book a site tour on WhatsApp: wa.link/t5x8rb
At about KSh 2,500 a board, 34 sheets is KSh 85,000. That is the deck an EPS slab skips. Another benefit is less concrete on top. The topping on an EPS slab is 50 to 75 mm, against 150 mm on a conventional slab.
1
1
6
At about KSh 2,500 a board, 34 sheets is KSh 85,000. That is the deck an EPS slab skips. Another benefit is less concrete on top. The topping on an EPS slab is 50 to 75 mm, against 150 mm on a conventional slab.
A conventional 100 sqm slab needs about 34 pieces of marine board across the whole floor. An EPS slab only needs boards on the beams. The panels replace the full deck.
1
1
1
16
A conventional 100 sqm slab needs about 34 pieces of marine board across the whole floor. An EPS slab only needs boards on the beams. The panels replace the full deck.
1
1
2
16
You spend too much time and money on a normal slab. EPS cuts both. > No full deck of boards > Less concrete to pour > Fewer boards to buy or hire Want to see an EPS slab up close? wa.link/t5x8rb
5
Less weight, same strength. As your house rises floor by floor, you save: > Time on the build > Load on every beam and column > Load on your foundation
2
2
7
Less weight, same strength. Your beams, columns, and foundation do not have to carry unnecessary weight! A reinforced concrete slab is heavy but it offers you the safe structural strength. What if you can get the same structural safety with less weight?
3
EPS for the SLAB! A lighter slab, with steel and concrete doing the structural work. Less load, same strength!
1
1
12
HAPPY MAZINGIRA DAY🇰🇪 A construction future calls for dedication to environmental conservation and sustainability.
1
1
25