The first image is up on the wall!!!
master node installation complete.
All PCs connected to TVs. PC screens showing on TVs. TV back panels installed. One spare TV panel created, put back in box.
Mike has put powerplugs. Getting quote for surge protectors. All TVs set to correct input.
Luc, Lance, Byungil are here. Setting up PCs.
All 5 columns are up.
Windows PC connected to TVs. Remote used to set mode, input. TV shows PC screens.
Four columns up. One TV is broken. Spare will replace it.
Three columns are up
Greg is in. Second column close to completion.
Greg is preparing (cutting, assembpling) other columns for installation of TVs for tomorrow.
First column with 4 TVs is up. 17 PCs waiting outside the room.
Mike brought the saw. Greg has moved all the TVs inside the room. Lunch planned for 12 noon.
The columns are too long. I asked Mike to get a saw to Greg. Greg will cut the columns. Waiting for Mike.