Steve Green (@steve_3phase) profile picture

Technical Engineer at 3 phase Design providing consultancy in the IEC 61439 series of product standards to the LV Switchgear & Control Panel industry worldwide.

Nottingham, United Kingdom
Joined November 2010
3 Phase Design Ltd are looking for Low Voltage Switchgear specialist to join them lnkd.in/d7H8hYM
Employee development is critical to business growth which is why one of our apprentices is accompanying me to the short circuit test lab
3
1
RT @nw3PhaseDesign Just released, 3PD Whitepaper on Device Substitution, register to download your copy lnkd.in/Z6uss6
RT @sparksmagazine David Blaine successfully ends three-day stunt standing in one million volts of electricity!! dailymail.co.uk/tvshowbiz/ar…
ESC at the centre of Part P debate - Voltimum UK - Electrical Installation Products and Contracting shar.es/uNcyk via @sharethis
RT @IECStandards Great visual - "War of Current" http://t.co/LvWpy1yT Enjoy! ^SP
1
1
100kA Short circuit tests gone well over the past 2 days. A couple of surprises along the way proves the need for design verification tests.
Heading to the short circuit test lab for a busy week witnessing 1600A, 4000A and 6000A switchboards being tested upto100kA/1s
Steve Green retweeted
The #new website for 3 Phase Design has been launched. Loads of info online. #IEC61439 #LVswitchgear 3phasedesign.com
Excellent day witnessing short circuit tests in Holland. 100% pass rate for another 3PD client.
Heading off to Saudi Arabia with Oliver Mackley from 3 Phase Design to meet a client
Really good meeting in Dammam KSA. Exciting design project ahead.
Waiting for take off from Bahrain, headed for Dammam KSA for IEC 61439-2 design consultancy meeting tomorrow.
Dubai's neighbouring emirate on track for growth. http://bit.ly/lq7c5a (gulfnews : Ras Al Khaimah: The emerging emirate)
On my way to a DEKRA test lab in Holland to witness a temperature rise test on an LV PSC Assembly.
Congratulations to our UAE client, he now has his MDB & SMDB assemblies verified as IP54 after 2 days of tests via kA Testing.
1
A good result for one of our UAE clients today, I witnessed both his assemblies pass water ingress protection tests to IP X4. Tomorrow dust.
Back home after a busy 3 days at the s/c test lab. Celebrating the clients 100% pass rate with glass of red wine.
Heading back to the short circuit test lab for a second day of testing. Yesterdays tests were successful and the client is very happy