Electric vehicle charging from a driver's perspective. Posts by @Lanny

US🇺🇸
Joined December 2014
PlugInSites retweeted
A new Supercharger is coming soon to Columbia, Maryland!! Permits were filed last week for an 8-stall V4 PSU station at the Wegmans Food Market on McGaw Rd. The site is located about 2 miles off Interstate 95 via MD-175.
3
3
1
31
1,568
Replying to @pluginsites @grok
Ouch! No EV charging at any variations of garages!
1
1
3
174
As of yesterday Tesla has 100 True v4 Superchargers Open (43) or In Construction (57) across North America (86) and Europe (14) less than 1 year after the first v4 Supercharger opened in Redwood City
1
1
89
SWTCH app: 4 of 6 dual-port units UNDER REPAIR. 🚫🚫🚫🚫✅️✅️ On site: the original 5 units still have W&M yellow WARNING tags reading CONDEMNED FOR REPAIR. 🚨 13 days since those tags were documented — still not repaired. 🪄 E1190/E1191 now shows as available in the app. On site, the tag appears ripped off; the metal security wire remains tight on the CHAdeMO plug. No sign this unit was inspected or returned to service by an RSA or W&M. ⚠️ None of the six units display W&M registration compliance stickers. E1196 remains the unit previously observed in service. App status and on-site condition do not match. Watching what @MdAgDept and @myBGE do next. @BWI_Airport @swtchenergy @GovWesMoore @MarylandPSC @OpcMd @lyft @Uber @MDEnergy #EVCharging #BGE #MarylandEV – at Linthicum, MD
🚨 Update — BWI Airport Ride Share lot (BGE DCFCs) As of today, 26 August 2026, five of the six dual-port DCFC units are out of service. 🚫🚫🚫🚫🚫✅️ Five units carry Maryland Department of Agriculture Weights & Measures yellow WARNING tags reading *CONDEMNED FOR REPAIR*. No date appears on the tags. 🤞🏻 One unit remains in service: E1196. In the SWTCH app, 10 of 12 ports at this site show as unavailable and listed as UNDER REPAIR. 🛠 This site has had repeated outages over a long period. Today’s visit documents the current condition, including the official W&M tags. 🧐 Watching what @MdAgDept Weights & Measures and @myBGE do next to return the condemned units to service. @BWI_Airport @swtchenergy @GovWesMoore @MarylandPSC @OpcMd @lyft @Uber @MDEnergy #EVCharging #BGE #MarylandEV
1
1
4
263
PlugInSites retweeted
Replying to @pluginsites
ghosts
1
2
81
PlugInSites retweeted
Got to give @ElectrifyAm credit they replaced the entire NextGen dispenser which was broken for close to two years at Montgomery Mall MD. The current dispenser is new. Not sure what went wrong with the old one but it is no longer an issue. 6 of 6 chargers working @pluginsites
1
2
7
221
🚨 Update — BWI Airport Ride Share lot (BGE DCFCs) As of today, 26 August 2026, five of the six dual-port DCFC units are out of service. 🚫🚫🚫🚫🚫✅️ Five units carry Maryland Department of Agriculture Weights & Measures yellow WARNING tags reading *CONDEMNED FOR REPAIR*. No date appears on the tags. 🤞🏻 One unit remains in service: E1196. In the SWTCH app, 10 of 12 ports at this site show as unavailable and listed as UNDER REPAIR. 🛠 This site has had repeated outages over a long period. Today’s visit documents the current condition, including the official W&M tags. 🧐 Watching what @MdAgDept Weights & Measures and @myBGE do next to return the condemned units to service. @BWI_Airport @swtchenergy @GovWesMoore @MarylandPSC @OpcMd @lyft @Uber @MDEnergy #EVCharging #BGE #MarylandEV
🚨 DAY 135: BGE’s @BWI_Airport Ride Sharing lot EV charging site REMAINS A DISGRACE! 3/6 DCFC units (dual-port CCS/CHAdeMO) STILL OUT OF ORDER, per SWTCH app—DOWN 135 DAYS since reported 9/15/25! 🚨 DISTURBING NEWS: At BWI, confirmed—Unit E1188 reported to SWTCH & under repair since 7/3/25 (209 DAYS DOWN)! Additionally, station E1190 charges at 36kW! 🎯 BGE has submitted to MD PSC intent to terminate DCFC service at the BWI location and hand-off the site to a private charge point operator chosen by the BWI authorities. 👎🏼 Maryland’s HB 834 97% uptime requirement is UTTERLY DESTROYED! Q3 (92 days) FAILED: E1188 uptime ~2% (down 90 days)! Q4 (92 days) FAILED: E1188 uptime 0% (down 92 days)! Q1 (28 days so far) FAILING: E1188 uptime 0% (down 28 days)! Ride-share drivers, promised an EV future, are BETRAYED! @myBGE @swtchenergy @GovWesMoore @MarylandPSC @OpcMd @lyft @Uber 🚫 END THIS NOW! No more "fixes"—stop wasting ratepayers' money! @BWI_Airport Baltimore, & @MarylandPSC it's time to TERMINATE BGE's involvement in EV charging! BGE is DESTROYING the reputation of emerging EV infrastructure! Let professionals deliver! #EVChargingFail #BGE #MarylandEV #MarylandBetrayed @MDEnergy
2
2
9
1,232
Finding available Superchargers near you has never been easier. Now available on Pangea for iOS and Android. app.pangea.inc
2
2
430
PlugInSites retweeted
Replying to @pluginsites
It really says something that a company like BGE can’t or won’t comply with the weights and measures requirements.
1
4
100
Silver Spring, MD Supercharger Update: Stalls and Cabinets in Place…Next Up Transformer and Meter… @mdvolt @pluginsites @phillipstewart @TeslaCharging
3
10
332
PlugInSites retweeted
The Germantown, MD site at Wegman's has 12x V4 posts with 3x V3 cabinets. Interesting that we will have to go in forward or reverse depending on which spot. Seems they are just waiting on the power company to install the transformer and connect power.
1
1
5
192
No change.
1
1
4
257
PlugInSites retweeted
Is it not fair of me to expect that @ElectrifyAm ever repair or replace the old @sksignetusa chargers at Walterboro SC? #ChargeOn none work at specified power if they even work. @pluginsites @itskyleconner – at Walterboro, SC
2
1
4
441
PlugInSites retweeted
Some people plan road trips around the scenery. We plan ours around the hoagies. The fences are up at @Wawa: 📍 Baltimore, MD — 8 charging bays 📍 Gambrills, MD — 6 charging bays 📍 Jacksonville, FL — 8 charging bays Drop a ⚡ below for the spot you're most excited for.
8
7
2
45
2,082
PlugInSites retweeted
We've got V4s coming to Charles County.
2
5
4
35
3,583
Upper Marlboro, Maryland @ionnaofficial progress.
1
1
1
6
682
PlugInSites retweeted
Large double trench @tesla Supercharger install happening at the Waldorf, MD @Target @superchargefeed @MarcoRPi1 @pluginsites @phillipstewart – at St Charles, MD
2
4
19
796
PlugInSites retweeted
Two Supercharger stations down in Middletown DE Wawa. 2C (broken conductor), 2D (no power). @superchargefeed @tesla_na
1
1
1
2
240
Supercharger Update: Transformer in Place, Next Stop Meter! Location: Laurel Supercharger #4 (Maryland City/Royal Farms) @pluginsites @TeslaCharging @mdvolt
1
2
12
464
PlugInSites retweeted
Now that our partnership with @SuncoastChrg is live, I wanted to take a minute to re-introduce Pangea (@PangeaEarthTech), the app we're building to make finding chargers fast and easy for everyone. We never really made a proper introduction to begin with. So, before talking more about our product, I wanted to introduce where Pangea came from, who we are, what we care about, and offer a taste of where we're going. Hope you all enjoy. (Article below)
3
6
13
1,410