V-Strong of greens this morning followed by a cut. Get some granular on this afternoon ready for the rain 🌧️ Thanks again to @BA_LTD for another great job 🏌️♂️⛳️
Struggling on. No serious irrigation to speak of (Bowser and hosepipes at a few greens) Don’t normally ask for it but could do with a drop 🌧️🏌️♂️⛳️
Part 2 of the work on the 9th fairway. Now sand banded to help the water drain through the surface and reach the drains. An extra 40 tonnes of sand has been applied through the banding. Yet again great work and thanks to @BA_LTD ⛳️🏌️♂️@LowesParkGC
Hoping to help the drainage at the bottom of the 9th fairway by applying 40 tonnes of sand and then verti draining the area. @LowesParkGC @BA_LTD 🏌️♂️⛳️ Stage one
Chris Milnes retweeted
The greatest to ever do it. Thank you, Pep 🩵
Pinch and zoom to catch every detail 🔎✨
Scarification of all fairways complete @LowesParkGC Thanks as always for a great job @BA_LTD ⛳️
Happy work anniversary to me! 30 years ago today someone took a risk and 30 years later still here and the boss man @LowesParkGC ⛳️



































