Matthew Canaran (@mattcanaran) header
Matthew Canaran (@mattcanaran) profile picture

Urbanist. Environmentalist. Gardener. Masters Student in Landscape Architecture at the University of Guelph. @mattcanaran on instagram

Toronto, ON
Joined March 2009
Birgit was awarded the 2019 Sustainable Buildings Canada (SBC) Lifetime Achievement Award, & led sustainability & innovation at an award-winning architecture form for 25 yrs. She knows what she’s talking about.
Seriously. You expect me to believe this? I saw your engineering review. It was an exercise focused on justifying your solution, and not a genuine investigation focused on finding new solutions. In addition, your engineering review report only came out a week ahead of clearcut.
1
3
12
Matthew Canaran retweeted
Sorry - It was entirely possible to mitigate this level of destruction. Missing: the WILL and a champion @metrolinx with vision, tenacity, determination, integrated design, collaboration with the right experts at the table. This is not rocket science. No moving parts @smallscreek
3
8
Matthew Canaran retweeted
Seriously. You expect me to believe this? I saw your engineering review. It was an exercise focused on justifying your solution, and not a genuine investigation focused on finding new solutions. In addition, your engineering review report only came out a week ahead of clearcut.
4
1
15
As with me! I learned about their efforts & the Mx project through @BradMBradford’s Instagram post. The more I learned, the more I became very concerned as an educator, professional, community member, #nature advocate, & mother who visited the wetland w/ 3 kids over 2 decades!
1
3
OK, so @RM_Transit @StephenWickens1 @MichaelLeoM @SwanBoatSteve, yeah it looks like Metrolinx is only planning for a capacity of 20,400ppl for the Ontario Line opening day (80m trains, 34tph). Anything more will come later, and will require an additional investment.
Replying to @mattcanaran
Station platforms will be built to accommodate 100m trains from the get-go. ^jw
1
Matthew Canaran retweeted
Yes, OL is assuming 100m x 3.0m, while Expo Line is regarded 68m x 2.65m (though Skytrain bought new trains, but still not the Ontario Line size),
1
1
youtu.be/pQk14sjKW_s A chilling view of the Small's Creek Ravine post-clearcut. Thanks to Alli Neuhauser of Bombus Haus, @mattcanaran and Chris Terry for all the video work! Time for our seat at the table @GOExpansion. The wetland can't wait. @BradMBradford @TOtrees @TRCA_HQ
1
7
4
12
When a government organization @metrolinx goes rogue. #wetland #nature #designfail #oaks lost #biodiversity lost. Is there an imaginary restoration plan being created with the imaginary community engagement? @smalls_creek_ravine @mattcanaran @lostriversto @nmlister @IUCN
2
9
1
28
A sad time. With no plan in place to protect and restore the wetland ecosystem.
1
1
Small's Creek is forever changed. I spent several days filming in the ravine during the clearcut by Metrolinx crews. A sad ending to a year long appeal by the community to find a way to preserve more of the ecosystem. youtu.be/-iZDl2mxm24
2
5
9
Matthew Canaran retweeted
Replying to @RM_Transit
In Sweden a lot of cycle routes use a combination of snow-brushing and salt for completely clear routes - which gives a lot better results than plowing+salt - and avoids the massive energy use from heating. – at Lund, Sverige
1
1
15
Replying to @kristynwongtam
Also, does anyone care yet that per-km GTA subway-building prices have pretty well doubled since @Metrolinx+@InfraOntario were brought in to wrestle costs back down after the TTC's York-Vaughan extension went 52% over budget? @BenSpurr @MarcoOved SSE is 2X with half as many stns.
1
2
7
Matthew Canaran retweeted
Small's Creek is silent, holding it's breath...and so are we. We have been ready to join the table to participate in the restoration conversation with @metrolinx @goexpansion for months. Time is of the essence.
This Post is from an account that no longer exists. Learn more
2
4
Taking transit from #coxwellstation @TTChelps to @uofg. @GOtransit bus ride was smooth, tho the long walk between Kipling Station #ttc and the new bus terminal made me miss my bus. I had to wait 1h for the next one. Also signage at the new terminal is very confusing!
1
2
Matthew Canaran retweeted
#TurningRed is a film about adorable animals and generational pain; it’s the best thing Pixar has released in years, reviews @alisonwillmore vult.re/3i1x2OE
4
77
15
532
Matthew Canaran retweeted
Now that we have some sort of procurement information, HFR is nothing else than a disguised PPP. A poor attempt at one. VIA has demonstrated they CAN deliver on projects, if given the resources. Letting the private sector dictate, operate and design the project is just ridiculous
1
3
28
Thank you @beyrima. You're the best.
This Post is from an account that no longer exists. Learn more
4
If @GOtransit's peak commuter ridership does not recover, this calls into qstn the need for projects like the rail yard in the Don @dontmesswthedon. The trend of reduced peak ridership, and growing off-peak ridership share began even b4 COVID & was happening all over the world.
This quoted post is unavailable.
2
I hope I'm wrong too, but @GOtransit needs to figure out how expand ridership in this new world of wfh. GO must better serve the City of Toronto, the largest pop. base in the region. This is why 2WAD, fare & srvc integration w the #ttc, & more stations in @cityoftoronto matters.
This quoted post is unavailable.
2
8