semi (@johnwayne12591) profile picture
Los Angeles, CA
Joined October 2020
Photo by semi (@johnwayne12591)Photo by semi (@johnwayne12591)Photo by semi (@johnwayne12591)Photo by semi (@johnwayne12591)Photo by semi (@johnwayne12591)Photo by semi (@johnwayne12591)Photo by semi (@johnwayne12591)Photo by semi (@johnwayne12591)Photo by semi (@johnwayne12591)Photo by semi (@johnwayne12591)
$AVGO secures first generation and second generation AI ASIC programs from openAI
10
8
10
98
67,973
$NVDA Jensen needs to come back. Nvidia is nothing without Jensen. The man who almost went bankrupt running that company to making it a multi trillion dollar empire deserves a second chance. #BringBackJensen
9
1,073
$AVGO They don't hand these awards out to just anyone. I still remember all those times you spent fixing tickets in the middle of the night. Thank you for all the sacrifices you made for my future, Dad. I will make you proud.
Random tidbit in an article about AI-based IT automation tools: $AVGO relies on just 40 or so IT workers to support ~50K employees. Hock sure knows how to run a tight ship. wsj.com/articles/it-departme…
2
1
10
1,965
We've signed an agreement with Google and Broadcom for multiple gigawatts of next-generation TPU capacity, coming online starting in 2027, to train and serve frontier Claude models.
1
1
15
1,826
$AVGO $NVDA The rollout of 10 GW of custom, rack-scale ASICs, designed with Broadcom, is aimed at achieving vertical integration from transistor to token starting at the inference level and eventually moving on to training. In my opinion, while it starts with 10 GW, it's this control over their own hardware roadmap, driven by the efficiency of custom silicon, that will ultimately reduce their dependency on any single vendor and eventually lead to more investment than 10GW.
5
1,318
$AVGO Since when did Hock go out his way to name customers? Wow… 😂 5th additional customer secured
Replying to @jbulltard1
Guidance is coming hot 📈
5
1
16
9,556
$AVGO $NVDA The rollout of 10 GW of custom, rack-scale ASICs, designed with Broadcom, is aimed at achieving vertical integration from transistor to token starting at the inference level and eventually moving on to training. In my opinion, while it starts with 10 GW, it's this control over their own hardware roadmap, driven by the efficiency of custom silicon, that will ultimately reduce their dependency on any single vendor and eventually lead to more investment than 10GW.
The $AVGO partnership isn't just a custom chip, but entire rack-scale cluster for reasoning inference, per the Broadcom + OpenAI podcast this morning: "Andrew Mayne: So this is going to entail both compute and chip design and scaling out? Sam Altman: This is a full system... the vertical integration point is really important... design the whole system, all of the stuff about the chip, the way we design these racks, the networking between them, how the algorithms that we're using fit the inference chip itself, a lot of other stuff all the way to the end product."
1
15
6,244
BROADCOM’S $AVGO CHIP PRESIDENT SAYS MYSTERY $10 BILLION CUSTOMER THAT IT ANNOUNCED IN SEPTEMBER ISN’T OPENAI - CNBC
8
2
66
22,424
Broadcom CEO on OpenAI partnership: “ChatGPT 5, 6, 7, on and on… each model will require a different chip, a better chip, a more developed chip, advanced chip that we haven’t even begun to figure out how to get there… but we will” hmmm so OAI is selling announcements to pump up stocks which in turn uses those pumped up stock (call options) to pay for present day hardware…
1
6
1,583
Meta has placed big orders to Taiwan's Quanta Computer for customized AI servers based on its next-generation ASIC (own chip, made with Broadcom), media report, noting Chenming Electronic is making cabinets, some liquid cooling parts, and sidecars for the servers. The order is seen at up to 6,000 cabinets, shipped by year-end. 1/2 $META $AVGO #semiconductors
2
1,252
Power of $AVGO ASICs
OpenAI is literally trying to build a replica of the TPU v6p… And apparently, that’s the reason they canceled the plan to lease Google’s TPUs. Every company wants to have its own clone of the TPU.
3
2
28
2,466
Micron Director predicts NVIDIA’s market share to fall to 50-60% by 2028 as hyperscalers use more ASICs and less GPUs in their workloads to optimize training and inference workloads.
A MUST READ INTERVIEW with a current Director at $MU on HBM & GPU/ASIC market ( $NVDA, $MU, Samsung struggles ): 1. The hyperscalers $AMZN, $MSFT, $GOOGL are achieving significantly higher GPU utilization rates than they had in the past years. In 2022 and 2023, the GPU utilization rates were less than 40% The ROI on that in terms of hyperscalers getting their investment back used to be 12-18months. Now, the utilization rates are 70%-80 %, and the ROI has accelerated to only 6-9 months. 2. When $NVDA's Rubin comes out, he expects even higher GPU utilization rates - 90%. With Blackwell next year, he expects the cost of training on hyperscalers to be in the $60-$70 per hour range and for inference, smaller cases to be in the $5-$10 per hour range. 3. The supply of $NVDA's H100 has dramatically increased. The shortage, in his view, has been reduced mostly because of $TSM, which has improved their 4nm yield a lot as the technology has matured and as HBM availability has been good. In his words, when it comes to HBM, we are now moving from »call scarcity« to »high-volume pricing«. 4. HBM has been almost 2X-2.5X year on year. Both SK Hynix as well as $MU first had yield challenges as the biggest problem is TSV technology (through-silicon via), because you have to put eight of these chips on top of each other. If you have to put 12 of these on top of each other the connection between them is the biggest challenge. Both $MU and SK Hynix have become very proficient in that area. He continues to see the pricing going up slightly on the ASP for HBM. 5. He gives the example of HBM use in B100. If you say eight-high stack, that's around $400-$500; if you're using five or six of those, that's around $2500-$ 3600. It is 30% of the GPU cost in most cases. 6. The reason why HBM capacity has caught up in his view is not because of Samsung, but because the TSV technology has matured, and both SK Hynix and $MU have converted most of their CapEx into expanding HBM. He thinks this year might be the last year where we have a scarcity. He thinks 2026 will be even better with availability. 7. The reason why Samsung has struggled with $NVDA's certification process is because of thermal issues. $NVDA B100 and H100 have very tight thermal margins because they're using more than 700W of power. Each signal requires eight Gbps per pin. 8. Samsung has been struggling with the DPPM rate (defect parts per million rate), as it is significantly higher on Samsung parts compared to their competitors. The second thing they struggle with is the eye diagram. The eye diagram is the margin, and according to him, that margin has always been poor compared to SK Hynix and $MU. The reason is that $NVDA uses NVLink. The poor margin also affects the data transfer. 9. According to him, it makes sense that $AVGO approved Samsung as they use less than 300W of power and have more margin, $AVGO uses four Gbps-six Gbps per pin, $NVDA uses twice that, both in power as well as data transfer rate. 10. He thinks that by 2028, $NVDA's market share will be reduced to 50-60% with most of it going to hyperscalers doing their own ASICs. He mentions $GOOGL, noting that their TPUs are at the forefront of this, as they have highly customized FP4 optimization for inferencing and have already deployed TPUs for Gemini, as well as for internal AI training. Second is $AMZN's with Trainium, while both $META and $MSFT are still a bit behind and need to catch up. If he had to make an educated guess, he thinks that $GOOGL and AWS are already serving 50% of their own internal inferencing with their custom ASICs.
4
4
1
33
5,250
Hock’s 2027 SAM guidance doesn’t sound so crazy after all.
$AVGO “The team believes that the current inference demand exceeds capacity. This strong demand for Al inference was not accounted for in its 2027 SAM forecast ($60-90B SAM for their three existing Al customers by FY27), and could represent a potential upside opportunity.”
1
3
846
$AVGO “The team believes that the current inference demand exceeds capacity. This strong demand for Al inference was not accounted for in its 2027 SAM forecast ($60-90B SAM for their three existing Al customers by FY27), and could represent a potential upside opportunity.”
DeepSeek has effectively challenged NVIDIA's training moat by demonstrating high-performance models can be trained for much less. This explains why NVIDIA's largest customers are prioritizing inference capex, while Broadcom continues securing major customer wins with their custom ASIC XPU platform.
5
5
1
27
4,318
$AVGO securing 2 nm design wins at Meta and Google
$AVGO fast tracking 2nm chip production with Japanese Semi Firm
1
3
24
3,244
$AVGO Interesting Timing For Announcement: Tomahawk 6 or fast tracking of sample 2nm chips for XPU production went well.
$AVGO fast tracking 2nm chip production with Japanese Semi Firm
2
1
25
3,898
$AVGO Shipping XPUs to 3 hyperscale customers with 4 more building custom accelerators. $NVDA one-size-fits-all GPU approach is hitting its limit. Frontier AI models create demands no single architecture can optimize for. As models diversify, NVIDIA's general-purpose accelerators simply can't be configured to excel across all workloads. The GPU monopoly is ending as AI complexity outpaces what general-purpose chips can deliver. “New frontier models and techniques put unexpected pressures on Al systems. It's difficult to serve all classes of models with a single system design point. And therefore, it is hard to imagine that a general purpose accelerator can be configured and optimized across multiple Frontier models.” Hock Tan
Replying to @RickySingh89000
AVGO has 7 customers now. 5th is Apple. 6th still unknown. 7th is SoftBank.
2
1
1
35
4,976
Replying to @H10iVentures
So far the list for AVGO AI customers: 1.Google 2.Meta 3.Bytedance 4.OpenAI 5.Unknown - (potentially Apple) 6.Unknown - (no clue)
2
1,192
Softbank $ARM Project “Izanagi” AI initiative: Full blown Grace/Blackwell equivalent system all built on $AVGO custom ASIC XPU platform “A full-blown GPU/XPU/CPU integrated system-in package similar to NVIDIA's Grace/Blackwell CPU/ GPU solution - and we believe this multi-generational Al XPU chip program will be co-designed with Broadcom, the #1 market share leader in the custom chip (ASIC) market, given Broadcom's #1 market share leadership in total and Al ASICs, complex (>100B transistor per chip designs) chip design expertise, and critical IP. Similar to its other multi-year customer partnerships (Google ASIC engagement, Meta ASIC engagement), we believe project Izanagi will be multigenerational - 3nm and 2nm manufacturing (TSMC) and will adopt next-gen advanced packaging architecture, called 3D SOIC”
JPM: We believe the AI compute requirements of SoftBank alone could drive a 1M XPU/cluster silicon SAM opportunity for Broadcom ($30B potential revenues) over the next few years - especially now with Softbank-announced AI programs like project Stargate ($500B in AI investments), SoftBank/OpenAI JV (“SB OpenAI Japan”) and AI initiatives like Cristal (to be deployed across Softbank’s large datacenter network). We believe that Masayoshi Son (Chairman, CEO, Founder of SoftBank Group) has always believed that compute silicon innovation was a key building block to unlocking more innovation in the technology sector, like AI, and this motivated him to acquire ARM (leader in compute CPU IP) in 2016 and Graphcore (AI accelerator IP/chip company) in 2024. As AI has catalyzed a focus on new compute silicon architectures, various news outlets have reported on SoftBank’s internal AI semiconductor initiative called “Izanagi” (see Figure 1) – we believe a full-blown GPU/XPU/CPU integrated system-in package similar to NVIDIA’s Grace/Blackwell CPU/GPU solution – and we believe this multi-generational AI XPU chip program will be co-designed with Broadcom, the #1 market share leader in the custom chip (ASIC) market, given Broadcom’s #1 market share leadership in total and AI ASICs, complex (>100B transistor per chip designs) chip design expertise, and critical IP. Similar to its other multi-year customer partnerships (Google ASIC engagement, Meta ASIC engagement), we believe project Izanagi will be multigenerational - 3nm and 2nm manufacturing (TSMC) and will adopt next-gen advanced packaging architecture, called 3D SOIC, which allows for chip stacking and would further maximize transistor density/ overall performance and lower overall power consumption. Additionally, we believe the SoftBank/Arm ASIC designs will be integrating Broadcom’s world class 200Gbps/channel I/O for maximum networking data throughput. Furthermore, we believe Broadcom has won at least the first two generations of these new ASIC programs and the first of these ASICs appear to be targeted to ramp in CY26 based on the reported timeline of the SoftBank/Arm chip development process and the urgency of the Stargate project timeline.
2
9
3
33
9,179
$AVGO ASICs curve accelerating
JPM: On track to ramp next-gen Google and Meta 3nm ASICs in 2H...Meta still on track to become next multi-billion dollar customer for Broadcom in CY25/ CY26 – and set to ramp OpenAI and SoftBank/Arm AI ASICs in CY26… strong AI pipeline/revenue growth outlook. We believe the Broadcom team is set to ramp Google’s next-gen TPU v6 3nm AI XPU in the 2H of this year (with upside in near-term orders for its prior generation TPU v6 5nm AI XPU). We estimate Google drove $8B+ in revenues for Broadcom last year and $11-$12B+ in revenues this year. Furthermore, as we wrote in an update report last year, Broadcom has already secured wins for Google’s next-gen v7 TPU platform and is in early discussions with Google on its v8 platform. On Meta, we first called out Broadcom’s AI TPU win (called MTIA) with Meta back in 2022 and the team is on track to ramp Meta’s next gen 3nm chip towards the back half of this year and into CY26. Based on the reported timeline of the SoftBank/Arm chip development process and the urgency of the Stargate project timeline, we believe the OpenAI ASIC program and SoftBank/Arm ASIC program are being targeted to ramp in CY26/CY27 – and both programs will be INCREMENTAL to the $60B-$90B AI SAM opportunity Broadcom outlined in their last earnings call. $AVGO
1
1
16
4,459