Project Update: Preye Residence, a single-family house.
Excited to share how it’s going
As architects of this project, we ensured the building meets the client’s essential needs. The ground floor features a welcoming area for guests, a gym and a space for family business. The main living area starts on the first floor.
Hood retweeted
Good morning my mutuals, I just started writing on substack and you can find the link in my bio. Kindly subscribe, thank you.
Hood retweeted
"Sceptics often claim that the Qur’anic account plagiarized the four-stage embryological schema of the Greek physician Galen. Lol. They must be jokers. Tzortzis explicitly refutes this by highlighting major discrepancies"
Read here;
open.substack.com/pub/themus…
Hood retweeted
Congratulations. I am genuinely happy for you guys. Looking forward to the parade👏🏾👏🏾👏🏾
Hello sir @Omojuwa have you seen the news. The premier league player of the season? We told you it was going to our boy, BRUNO!
Manchester United !
Hood retweeted
Replying to @hoodmob
This is so true, a client gave me total freedom on a project recently...had me begging for rules lol
Hood retweeted
Replying to @hoodmob @_notyazeed
“The moment you agree to take a job for a fee, then pour everything you have into it”
Hood retweeted
Can you guess how much it cost to complete this 3 bedroom bungalow, based on your experience in or what you know about construction projects?
I’m sure many people will have different figures.
The major reasons (and arguably the only real reasons) why projects of the same type and scope within the same location can cost very different amounts to build come down to two core factors:
-Quality of materials (as defined by specifications), and
-Quantity of materials used
Most people understand the issue of quality. However, the issue of quantity is often overlooked, even though it has a major impact on both cost and performance.
1. Quality and Quantity of Materials (Starting from the Foundation)
Take blockwork as an example. For 1m² of blockwork (about 10 blocks), there is a standard quantity of cement and sand required. However, some deliberately reduce the cement content or use inferior sand so that one bag of cement lays more blocks than it should. This practice reduces cost but compromises strength and the integrity of the foundation, which directly affects the building’s durability.
Even the quality of blocks varies. On some of our sites, blocks are produced using a mixture of sharp sand, stone dust, granite, and cement, resulting in stronger blocks. This cannot be compared to blocks produced with only sharp sand and cement.
👉 This is the difference between:
-Mechanically produced blocks (N550–N700 per block)
-Hand-moulded blocks using weak mix (N350–N450 per block)
Naturally, both the cost and performance differ.
2. Filling and Substructure Works
The type and quality of filling materials also significantly affect cost:
-Stone
-Crushed granite
-Hardcore
-Well-graded sharp sand
Then, the number of filling layers and the level of compaction vary from site to site, some don’t even compact at all. All these directly influence cost and long-term performance, such as floor settlement and cracking.
3. Oversite Concrete and Mix Ratios
Concrete quality is another major differentiator. Standard mix ratios such as:
-1:3:6
-1:4
-1:2:4
-1:1.5:3
are not interchangeable. Yet, on many sites, concrete is mixed without measurement, sometimes using cement and sand only.
You cannot compare:
-Proper oversite concrete (1:3:6 with granite)
with
-Weak oversite made from cement and sand alone
Both may be called “concrete,” but they are not equal in strength or durability. Also directly affects the cost of project.
4. Reinforcement and Structural Elements
Reinforcement quality also varies widely:
-TMT reinforcement versus light, substandard steel
-Correct bar diameters versus undersized bars
The difference between a correct 12mm TMT bars and light-weight or fake bars is significant, both in cost and structural performance.
Some buildings even omit structural elements such as columns or under-reinforce them. While this reduces cost, it significantly increases structural risk.
5. Formwork and Timber Quality
The quality of:
-Marine boards
-Planks
-Other formwork materials
affects not only cost but also the quality of concrete finish and accuracy. Not all marine boards or planks available in Nigerian markets meet the same standards, and not everyone uses materials of acceptable quality.
6. Superstructure and Finishes
Plastering and screeding quality varies based on:
-Sand quality
-Cement quantity
-Mix ratio
-Coverage per bag of cement
There is a standard coverage per bag of cement, but many exceed this by reducing cement content purely to reduce cost.
Before tiling, proper sand screeding should follow standard ratios, yet compliance is often ignored.
7. Tiles, Finishes, Furnishings, and Decoration
Tile quality differs significantly:
-Locally produced tiles
-Imported Spanish, Italian, or Indian tiles
For example:
-N4,000/m² tiles versus N15,000–N30,000/m² tiles
The same applies to:
-Paint brands
-Sanitary wares
-Doors and windows
-Furniture
-Electrical and plumbing fittings
So when someone says they completed a project for a particular amount, they may be correct—depending on:
-Material quality
-Material quantity
-Compliance with standard construction practices
This is why construction cost comparisons must always be based on specifications, not just location or building size. And regardless of how small your project is, it is always advisable to consult a construction professional for proper guidance, before you commence, not after.
Hood retweeted
interesting never thought of it this way, i saw it as a common thing especially with commercial complex but residential on the other hand always have theirs en-suite
In designing security houses it’s good to make sure the toilet access is from the outside.
This way if they have to use the toilet at midnight they would step outside.
I have seen how this helped a family; a thief came in, stole something and was just leaving the premises before the security man who only came out to ease himself caught him.
A security house should not be ensuite, that’s too much coziness