The @EMFCamp Network Operations Centre. Our presentations and tools are at https://xitter.cf/t.co/wrY66gUWHE

Eastnor Castle Deer Park, Ledbury, UK
Joined August 2012
The recording of the EMF 2022 Infrastructure Review presentation is now available! youtu.be/8grwYpDD4D0
3
5
32
The EMF power grids are designed, built, and tested by consummate professionals. Diesel generation remains the most environmentally conscious and cost-effective option.
2
22
We remain open to developments (for example we used batteries as a buffer to minimise generator runtime during low load this year) but the cost of network reinforcement to deliver sufficient grid power to this remote field is staggering. Economics may change by 2024, we’ll see.
3
20
The poor NOC-DC will go back to storing food instead of internets.
1
18
Thank you for all your kind words, they are really sustaining everyone still working on site two weeks on!
16
All the field has been rolled in except the NOC-DC which, due to a complex sequence of dependencies, is fully up and running today while the tent it is due to be unloaded into is being deconstructed!
1
23
oom-killer in Docklands finally oom-killed something important. At least it waited until y’all were off site!
20
Here are the slides from our infrastructure review talk yesterday. Warning: 54 MB of superfluous photos. github.com/emfcamp/emfnoc/bl…
1
1
16
Failed test: earth fault loop impedance Zs too high.
7
6
3
86
Fax from 9957497 #emfcamp
3
19
Everything is fine. This was not linked up to an actual monitoring system. Although it should be next time!
2
22
Infrastructure review: 18:30, stage A
2
14
And if you’re currently free, go and speak to the volunteering team in the info tent. There are many slots that need filling, and none of them are difficult.
4
7
Disconnections are handled by volunteers. From the rota, I can see the first shift begins at 11:45 and there is 1 volunteer assigned to it. The last shift ends at 20:00. Tomorrow the shifts run from 07:45 to 12:00 (the last time you are allowed to be on site). Plan accordingly.
4
Information. Here is some. More in our talk tomorrow @ 1830 in stage A. dashboard.emf.camp/
Grid power outage. Our street cabinet is running on UPS. Runtime ???. Telehandler operators are en route with a generator. Can we beat Western Power?
1
17
We beat them by seconds \o/
1
16
"Don't be an arse". Did that really need to be said?
10
Please try to avoid dragging our expensive fibres, and if you do manage to pull it so much you take all the slack and rip it out of the switch, then at least let us know…. workshop 4 network will be back later