Everyone should note that this isn't the first extra payment from NASA to Boeing on this contract. In 2016 NASA paid them $287.2 million to speed up production for missions three through six to prevent an 18 month scheduling gap.
NASA will pay Boeing $359 million to facilitate Starliner's return to flight, and help certify the Vulcan rocket for future missions in the 2030s.
If eager space were to do a series on non-rocket launch technologies, what technologies/approaches should be covered?
A youtube member asked me for an update on NASA's commercial LEO station program.
It doesn't look good, folks...
youtube.com/watch?v=Cmts5S2d…
I had Ariane way down the list because ramping up is so hard for their org and they have a big backlog because of the delays.
My money was that ULA would figure out that they were the front runner and make Vulcan the main launcher.
But, as Eric says, here we are...
I'm not sure any of us expected Arianespace to be Amazon's most important launch partner for Leo, but here we are.
newsroom.arianespace.com/ama…
I sometimes get asked about presentations and speaking or creating videos.
This is my favorite guide. Make sure to read the notes with the slides afterwards.
perl.plover.com/yak/presenta…
Space Castles to the Moon and Mars - Do Cyclers make sense?
youtu.be/WUlwO7uUXFE?si=1Zyp… via @YouTube
This was a valiant try on a very tight budget and schedule. Kudos to Katalyst for their attempt and NASA being willing to try it.
Katalyst Space is calling off its effort to reboost NASA's Swift gamma-ray observatory because of ongoing attitude control problems with its Link spacecraft.
linkedin.com/posts/katalyst-…
I was looking for a good Apollo versus Orion comparison image. I mostly just found this:
Help me list the problems. I'll start:
That's not at all what the Orion universal waste management system looks like.
Looking for someone more skilled than me in video editing and production to collaborate with me on a short space video that has to exist. Expected length is about 4.5 minutes.
This is a paid gig.
Interesting idea. One region where you can do stuff and not compete with SpaceX...
Rocket Lab Germany is here.
Europe faces glaring gaps across both launch and spacecraft manufacturing. Rocket Lab Germany addresses these directly, combining opportunities for high-frequency access to space with high-volume satellite production to deploy resilient constellations on rapid timelines.
Read more: bit.ly/4wUJvbS
I was looking forward to this Off Nominal:
offnom.com/episodes/251
I seem possible that the starship heat shield has significant issues, but we have NASA heat shield experts who don't provide any concrete alternatives, just "first principles and basic research"
Word.
This is exactly right on the biggest problems with NASA.
Replying to @SpaceArchivist_
I will weigh in, reinforce some of the programmatic changes made, but also use the opportunity to emphasize the importance of getting things right from here forward.
NASA can’t succeed if it is trying to take on endless complex and costly development programs in parallel: SLS, ML-2, EUS, Gateway, crewed vehicles, a deorbit vehicle, replacement station-as-a-service, all the exciting science missions we all love, and a healthy fleet of X-planes. The solution becomes partnering with everyone who can fill holes in the self-inflicted strategy, which leads to more compromises. Those partners then run into their own budget challenges or quality issues, and the solution is simply to slip the schedule until what you eventually get, if you get it at all, is no longer relevant. This should be reasonably obvious when you look at the pace of progress: years between big missions, stretching out on-orbit ISS missions, one signature X-plane that wasn’t flying much, and years between big science programs.
Recycling a lot of parts from Shuttle may have been logical in 2005, as I am sure many of the programs envisioned in years past seemed logical at the time, but it led to a lunar rocket where Saturn V was materially better at converting pad mass to mass headed for the Moon, while simultaneously building a lunar Gateway in an NRHO orbit that shifts a huge performance burden to the landers because of compromises made earlier in the Orion/ESM design. The indefinitely paused Gateway concept also came with safety concerns, including limited abort opportunities, along with orbital and communications disadvantages. Not to mention, it is just another costly and complex “part” in what is already an incredibly hard equation, and one we haven’t solved in more than half a century. We also want to be building the infrastructure for an enduring presence on another world..not above it.
Mistakes of the past are what lead us down the path of a single lunar rover-as-a-service, when you need dozens for the future Moon Base, a dream state reactor-as-a-service, because you can’t afford to do it the right way, one X-plane, and ultimately means you get none of what you actually want on the Moon because you spread yourself too thin to develop something extremely difficult in a logical, iterative way.
Now we are fixing the SLS program, standardizing, and getting into a cadence of launches that will ensure NASA astronauts can get to the Moon at least yearly until other commercial and more affordable means of transport are available. By that point, we should already be well prepared for the ‘Nuclear NASA’ transition. Artemis, as a program, will certainly live on past any one launch platform.
I say all this because the second space race is going to be a lot closer than it needed to be, and under this Administration, we are going to ensure the third race will never be in question.
We've grown used to the world with SpaceX. But what if they never existed? What would that look like?
Thanks to @AndrewHard96304 for the topic...
youtu.be/SGemeJ7hxWA
Why was the Orion team the only one in the *constellation* program that got the memo...
The Ares rockets are named after the god Ares (aka Mars)
The Altair lander is named after a single star
The Earth Departure stage team totally blew it...












