Joined February 2025
Replying to @ClaudeDevs
@ClaudeDevs @claudeai For large, multi-stage tasks: when the Fable 5 safety lock engages during a specific task, configure OPUS 4.8 to switch back to Fable 5. This allows OPUS to handle the locked phase and then hand the project back to Fable 5 to continue.
1
45
I believe this feature is absolutely essential. Previously, this was bypassed by reverting to the model, but now the interaction is blocked, forcing the entire task to remain in the "smaller" model.
2