Elon says 15GW of AI compute produced in 2027 may not come online that same year.
Here are the companies positioned across the infrastructure needed to bring it online:
Rapid Growth in the 1.6T Optical Receiver Module Market and the Issue of InP Supply Shortage
Market Growth and Outlook
Trend Towards Higher Speeds: As optical communication transmission upgrades from 800G to 1.6T, and further to 3.2T, the shipment volume of optical receiver modules is rapidly increasing, and the average selling price (ASP) and product configurations are becoming more sophisticated.
Market Size Expansion: The global optical receiver module market is projected to reach $67.7 billion in 2026, $131.4 billion in 2027, and $148.5 billion in 2028. Specifically, the shipment volume of products exceeding 1.6T is expected to increase by a significant 61% in 2027.
Major Bottleneck: InP Supply Shortage
Severe Supply-Demand Imbalance: Despite the high growth rate, the shortage of indium phosphide (InP), a key core material, is a major obstacle. In 2026, the global effective supply of InP for optical communication is estimated to be 60-75 million units, while the demand is expected to reach 260-300 million units, resulting in a supply shortage rate exceeding 70%.
Price Surge: The price of 2-inch InP substrates for optical communication applications increased from approximately $800 in early 2025 to $2,300-2,500 in April 2026, representing an increase of approximately 200%.
Essential Material: Even with the increasing penetration of silicon photonics (SiPh), InP remains essential for external laser light sources (EML, CW Laser, etc.), ensuring continued demand.
Companies exposed to this bottleneck:
InP substrates: JX Advanced Metals, Sumitomo Electric, IQE
InP epiwafers: IQE
InP lasers / photonics: Lumentum ($LITE), Coherent ($COHR)
Manufacturing equipment: Veeco $VECO
Optical modules: Lumentum $LITE, Coherent $COHR, Accelink
This is a bottleneck I’m researching closely as the industry moves from 800G to 1.6T and eventually 3.2T.
I’ll say this ONCE:
AI is the future.
And you can make A LOT of money before 2030 if you invest in the bottlenecks.
I screened AI infrastructure stocks for valuation, growth, demand and infrastructure exposure.
These 5 stand out:
Want the technical charts + thesis behind these stocks?
Join my Discord community.
I’ll be dropping the full technical charts, key DCA levels, entry zones, catalysts, and investment thesis for $SNDK, $MU, $ORCL, $APLD and $CRDO.
Join the Discord to get the full breakdown and follow these setups in real time
whop.com/checkout/plan_800uK…
1
377
5/
$CRDO | AI Networking
Trading ~46% below its 52-week high
Valuation: Growth valuation rather than traditional value.
Growth: Revenue has been growing at triple-digit rates.
Demand: AI clusters require exponentially more bandwidth as compute scales.
Infrastructure: CRDO supplies high-speed connectivity technology used inside AI data centers.
The AI bottleneck isn’t compute.
It’s moving data between the compute.
And that network has to scale too.
Don’t invest in the AI hype, invest in what AI cannot function without.
5
4,233
4/
$APLD | AI Data Centers
Trading ~48% below its 52-week high
APLD is aggressively scaling.
Growth: FY26 revenue grew 167% YoY.
Demand: APLD has secured roughly 1.4GW of contracted critical IT load.
Infrastructure: Those contracts represent approximately $36B of contracted revenue over 15 years.
AI needs power-dense data centers.
APLD is building them.
This is an asymmetric bet.
7
4,330
3/
$ORCL | AI Cloud
Trading ~57% below its 52-week high
Valuation: ~23× forward P/E
Growth: Oracle is targeting at least $90B in FY27 revenue.
Demand: Oracle has added more than $30B in AI cloud contracts.
Infrastructure: Its remaining performance obligations reached ~$664B as AI customers expand cloud and data center capacity.
$ORCL has been crushed from its 52-week high.
The market is worried about AI capex.
But the backlog says much about the future demand.
5
4,729
2/
$MU | HBM & DRAM
Trading ~22% below its 52-week high
Valuation: ~6× forward P/E
Growth: AI is driving extraordinary demand for HBM and DRAM.
Demand: Every generation of AI accelerators requires enormous amounts of high-bandwidth memory.
Infrastructure: Micron supplies one of the critical components required to scale AI compute.
The key question isn’t whether memory is cyclical.
It’s whether AI has permanently raised the floor of the memory cycle.
6
4,838
1/
$SNDK | Memory & Storage
Trading ~32% below its 52-week high
Valuation: ~7× forward P/E
Growth: FY27 EPS estimates imply ~200% YoY growth.
Demand: AI is driving massive increases in storage requirements across data centers, edge devices and eventually robotics.
Infrastructure: NAND + SSDs sit underneath the enormous amount of data AI systems generate and store.
SanDisk has also partnered with Kioxia on High Bandwidth Flash (HBF), targeting higher-bandwidth, lower-latency flash memory for next-generation AI systems.
The market still treats memory as cyclical.
I think AI could fundamentally change the size of the cycle.
8
6,025
Berkshire Hathaway CEO Greg Abel says energy could be the biggest constraint on the AI data center buildout.
Here are 5 stocks that could benefit from rising AI power demand:
7
6
2,025
$SEI: Power generation + infrastructure
Solaris Energy Infrastructure provides power-generation and distribution solutions for large-scale customers.
As data centers need more reliable power, dedicated generation becomes increasingly valuable for AI data centers.
293
$IREN: Powered AI capacity
IREN is one of the former bitcoin miners that already controls substantial powered land and interconnects.
That existing power position is what makes its rapid transition into AI infrastructure interesting.
224
$FPS: Switchgear + transformers
Forgent Power Solutions sits between the substation and the data center.
Its switchgear and transformers are critical for getting electricity from the grid into high-density facilities.
$BE: On-site power
Bloom Energy attacks the power bottleneck from another angle.
Its fuel cells can generate electricity on-site, potentially helping data centers avoid waiting years for additional grid capacity.
1
244
$VRT: Power infrastructure
Vertiv sits between the grid and the AI rack, providing the power and cooling infrastructure needed for high-density data centers.
It’s also moving further upstream into behind-the-meter power.
3
663
Anthropic just committed $35B to AI compute.
Most people focus on the $35B
I’m focused on what happens every time Claude answers a customer.
Because inference creates a continuous demand cycle across power, data centers, GPUs, memory, networking and cooling.
(Save this thread for later)🧵
The part I keep coming back to is inference.
Training happens in cycles.
Inference happens every time someone uses Claude, ChatGPT, Gemini, Grok and other AI models.
As these models become more deeply embedded in everyday workflows, the infrastructure supporting them has to keep scaling.
The models will change.
The applications will change.
But the physical bottlenecks required to run AI at scale aren’t going away anytime soon.
That’s why I remain long-term bullish on the AI infrastructure trade.
147
This is also why I’m not convinced the Anthropic IPO will disrupt the AI infrastructure trade.
Yes, it could affect software valuations.
But Claude still has to run.
And running Claude requires physical infrastructure: power, data centers, compute, memory, networking and cooling.
That’s the infrastructure stack behind names like $HUT, $IREN, $APLD, $NVDA, $MU, $ANET, $MRVL and $VRT.
That infrastructure doesn’t get hit badly when Anthropic becomes public. If anything, continued growth in AI usage keeps pushing demand for the infrastructure underneath it.
1
121
One important distinction:
Anthropic’s $35B commitment doesn’t mean every company mentioned here has an Anthropic contract.
The confirmed piece is the compute commitment and the additional capacity being secured through Lambda.
The rest is the supply chain implication of putting that compute to work.
100
The more I look at these deals, the less I see them as isolated cloud contracts.
They’re signals of how quickly AI inference is pulling demand through the physical supply chain.
More AI workloads require more capacity, and that capacity has to be powered, cooled, connected and supplied with compute and memory.
104
That’s where networking and optical infrastructure come in.
AI clusters require enormous bandwidth between GPUs, servers and networking equipment.
That puts $ANET, $MRVL and $CRDO in the connectivity layer, while companies like $PRY.MI, $AAOI, $LITE and $COHR participate further down the fiber and optical chain.
349