Lewis (@_LewP) header
Lewis (@_LewP) profile picture

Documenting my property investing journey I also record a few mixes and write about Economics, Self-Help and Philosophy

Joined November 2021
“National UK 3 Peaks Challenge — A short story from our climb” by LewP medium.com/@lewis.proctor/na…
8
This info is crucial for anyone in any walk of life for longevity and being able to live healthily for longer ⁦@drmarkhyman⁩
7
August 2023 - We’ve had the ceilings in both the back room and the kitchen replastered. In these rooms it was old artex ceilings and to give consistency throughout the house we have decided to get rid. It gives off a much cleaner finish and will look great once decorated.
1
21
August 2023 - It’s all plastered and made good now though, ready for decorating. We feel this will create a much more open and lighter space in the back room and we are planning to bring some kitchen units into this room to give it that kitchen/dining feel.
1
20
August 2023 - We had the kitchen door ripped out to form an opening. When a seemingly small job turns into a massive one… It turns out the door architrave was built into the wall so in order to get it out we had to rip half of the plasterboard in the room out.
1
18
August 2023 - We had the bathroom decorated! Really loving this room and cannot wait to see it completely finished with the flooring down. We went a bit overboard with the finishes but I think it’s really paid off and will make a statement to what we’re trying to achieve.
1
9
August 2023 - The staircase decoration is complete, now we are just waiting on carpets here which should hopefully be done next month. We also want to change the light to a spotlight at the top of the stairs for a slicker look.
1
14
July 2023 - Now we’re on to the staircase where the wallpaper has been stripped today. We will be getting this area decorated over the next few days and then all of upstairs is getting new flooring afterwards. Then upstairs is done! (Aside from some decorative bits)
1
33
July 2023 - The fireplace has been tiled! Really happy with how this looks and it’s a good centre piece to our new living room.
1
24
July 2023 - And another thing that we didn’t know upon moving in was that the loft was open and shared between the neighbours and there was pigeons up there from a neighbours property. So this month we got the loft separated out (away from the pigeons) and boarded out.
1
19
July 2023 - Another thing that we didn’t know about upon moving in was that the house didn’t have its own water supply. United Utilities came out to install it into the house and this helped with the pressure and consistency as it used to run through next door before ours.
1
42
July 2023 - So this month, we had the majority of the bathroom completed. There is still the paintwork and flooring still to be done but we are really happy with the finished product up to now. Both the paint and the flooring should be done next month.
1
15
June 2023 - How we’re living at the minute. So currently the house is a mess whilst the bathroom is getting finished off and the works to the loft have started. More on the loft next month but it is tough for us going through this at the minute. But we will get there!
June 2023 - We then started measuring the cellar to start getting the proposals drawn up. The cellar might be our biggest and most expensive job so we want to ensure it is done right. So I am sending the measurements to an architect that I work with for him to draw it up.
1
90
June 2023 - We then started measuring the cellar to start getting the proposals drawn up. The cellar might be our biggest and most expensive job so we want to ensure it is done right. So I am sending the measurements to an architect that I work with for him to draw it up.
June 2023 - We also made a start on our fireplace opening. With the tiler attending to complete works in the bathroom we aligned it so that he could also tile the fireplace at the same time. I think it’s starting to look great, what do you think?
1
1
113
June 2023 - We also made a start on our fireplace opening. With the tiler attending to complete works in the bathroom we aligned it so that he could also tile the fireplace at the same time. I think it’s starting to look great, what do you think?
June 2023 - The bathroom is getting there now and should be finished this week.
1
38
June 2023 - The bathroom is getting there now and should be finished this week.
June 2023 - Works on the bathroom has started. We went away for a week during June and we aligned this with getting the plumber in to start the works to the bathroom. It enables him to take out most of the fittings without having to worry about us needing them.
1
26
June 2023 - Works on the bathroom has started. We went away for a week during June and we aligned this with getting the plumber in to start the works to the bathroom. It enables him to take out most of the fittings without having to worry about us needing them.
June 2023 - Water Main In! A bit of a slow month to start with, ending quite manic. We got the incoming water main into the building and we are now just waiting for United Utilities to come and connect their end - which as we know, could take months…
1
23
June 2023 - Water Main In! A bit of a slow month to start with, ending quite manic. We got the incoming water main into the building and we are now just waiting for United Utilities to come and connect their end - which as we know, could take months…