Sankalan Chattopadhyay (@VinodDX9) header
Sankalan Chattopadhyay (@VinodDX9) profile picture

Enjoying Life ! oh yah trying to express feelings through @reviewvayu

Joined November 2015
Photo by Sankalan Chattopadhyay (@VinodDX9)Photo by Sankalan Chattopadhyay (@VinodDX9)Photo by Sankalan Chattopadhyay (@VinodDX9)Photo by Sankalan Chattopadhyay (@VinodDX9)Photo by Sankalan Chattopadhyay (@VinodDX9)Photo by Sankalan Chattopadhyay (@VinodDX9)Photo by Sankalan Chattopadhyay (@VinodDX9)Photo by Sankalan Chattopadhyay (@VinodDX9)Photo by Sankalan Chattopadhyay (@VinodDX9)Photo by Sankalan Chattopadhyay (@VinodDX9)
A small clip for Arjun lovers.
80
671
46
5,079
However, the gap between China & India, though gradually narrowing, is colossal. While India achieved the major power status in the research back in 2025, and is gradually growing, the failure to achieve accordingly should be a major concern. lowyinstitute.org/topics/ind…
3
164
Australia-based think tank Lowy Institute places India as a major power in the 2026 Asia Power Index despite concerns of India's underachievement vis-à-vis the resources. The publication places the Indian PM, Shri Narendra Modi, as the second-most effective regional leader.
1
21
474
BMP-2 Sarath vs NAMIS Mk-2 turret 1) NAMIS Mk-2 has an add-on metal frame to the Sarath turret & not a new one, this should be standardized for other Sarath as well 2) ADTS-BEL TIFCS vs new MSEOP 3) upgraded 9SH-119M1 for 1×KonkursM vs 2×2 Nag Mk2
1
7
116
1,707
9) IAF: RFI; 500 expendable ISR UAS 10) Ex: Malaysia, Harimau Shakti 11) IN: INAS312 ‘Albatross' turns 50 12) INS Sahyadri: PASSEX, Canada 13) INS Sahyadri: JAIMEX, Japan
4
212
5) Adani Defence: Bagheera T1 vehicle-mounted ATGM, tested 6) Astrogate Labs: laser, targetting and tracking 7) Space Fields: RATO booster, test fired 8) Vayuvya Defence: Vayu 250, 25 Kgf micro-jet engine, test fired
1
5
344
This week in Indian defence: 1) India-Japan LOI: utilisation of firing ranges of India to live-fire training including AShM 2) India-Japan JV possibility of D&D ship building 3) Design with Japan, Make in India 4) SSS: L1, 12-gauge shotguns
2
25
823
But it still would have one Achilles' heel: lack of indigenous engine. Without Indigenous engine, except Rafale, none of the other programs are secured and safe. And even in the case of Rafale, there will be some limitations. I wish we had solved that issue. End.
3
205
The procured 54 Rafale F3R ISE along with 36 previous ones could go through modernisation of F4 standard later. At that time we could negotiate integration of Indian systems, as much as possible, as we are bargaining now in OTL, with an additional order of 36, if required.
2
3
240
And the determining factors would be the sheer will and comprehensibility to take the right call in time. But none of these scenarios are mere "What If" fantasies. Many other countries have taken a similar approach with bigger investment for Indigenous projects.
1
4
98
Will it be wrong to accept that in almost the same investment for 114 Rafale in 2026, the above mentioned process would enable a far larger squadron strength and eventual stronger Indigenous ecosystem? I don't think so. Yes, definitely there would be multiple conditions.
1
4
100
ORCA would not be a stealth platform but would carry exactly the same nerve as AMCA. Thus would be far more advanced than Rafale (if AMCA Mk1 be superior to Rafale F4 so would be ORCA). And, being a non-stealth platform would have a higher serviceability to AMCA.
1
4
106
...a major chunk will still be supplied only after 2032, and that's the most positive case. So, with an early order of 54 Rafale, likely all would come by 2032 and ORCA production onwards would be far better in squadron strength. And LCA Mk2 would be produced in parallel.
1
4
117
An ORCA, ready for production by 2032, would match the same TL of the supply of Rafale in existing TL. In fact that time line is also possible if the deal is signed as early as possible. But anyways, even if we take the supply of Rafale it would commence by 2028..
1
4
123
Hence, I said, an IAF specific variant of the TEDBF could be a better alternative to the Rafale. Yes, of course, both TEDBF and ORCA must have been sanctioned earlier, must have been materialized early. Otherwise, this point becomes null and void.
1
1
5
132
7 sqn of LCA Mk2 is committed. But to full the min requirement of 42 sqn will require a huge number of platforms. And to go beyond that even further. No foreign acquisition will be financially viable and will ensure self reliance amidst the worst crisis!
1
4
139
Reportedly, the required variant of Rafale M for the IN is yet to be developed even after the IGA. While it's surprising (the IN statement could make it clear) would be the case for an early deal as well. So, there shouldn't be any complications during a joint order for 80.
1
4
161
An early order and less number than now, would have saved a serious amount of financial assets. That could have been invested for better and indigenous ventures. Yes, LCA Mk2 and TEDBF should have been faster. It's sad that both got so delayed. It should not have happened.
1
5
187
And for (36+80)= 116 an ecosystem of Dassault+ Safran+ MBDA would have been established. In fact, with eventual order from UAE (80) and Indonesia (42), that could be indeed turn into an Indian manufacturing facility churning out for all three countries.
1
5
220
So, an early trials for the Rafale M would enable a joint order of (54+26)= 80 an easier negotiation. The IAF already operates 36. This number is not sufficient to maintain long term spares supply and serviceability. So, an India MRO would required.
1
9
300
Yes, there should have been an additional and early order of another 54 Rafale F3R ISE, the same variant of which 36 already procured with an option of further procurement of 36 later period. As the IN would require a platform for INS Vikrant anyway, Rafale was inevitable.
1
13
437