Ravi Singh (@StocksWithRavi) header
Ravi Singh (@StocksWithRavi) profile picture

Engineer in Dublin building a concentrated US growth portfolio. AI infrastructure • Space • Growth. I share the thesis, numbers and what I’m getting wrong.

Dublin City, Ireland
Joined March 2023
Photo by Ravi Singh (@StocksWithRavi)Photo by Ravi Singh (@StocksWithRavi)Photo by Ravi Singh (@StocksWithRavi)Photo by Ravi Singh (@StocksWithRavi)Photo by Ravi Singh (@StocksWithRavi)Photo by Ravi Singh (@StocksWithRavi)Photo by Ravi Singh (@StocksWithRavi)Photo by Ravi Singh (@StocksWithRavi)Photo by Ravi Singh (@StocksWithRavi)Photo by Ravi Singh (@StocksWithRavi)
Core book, 2 Nov. Weights move with price. These are the trades. $TSLA 34%. Cost $179. $PLTR 13%. Cost $25. $SOFI 7%. Cost $11. $RKLB 7%. Cost $34. $NET 7%. Cost $99. $TEM 6%. Cost $55. $AMZN 5%. Cost $171. $MSFT 5%. Cost $510. $CBRS 3.8%. Cost $141. Added lower. $META 3.7%. Cost $624. Added 4 at $622. $NVTS 2.2%. Cost $8. $DOCN 2%. Cost $93. New. 15 shares at $96. $SPCX 1.9%. Cost $134. $UPST 1.7%. Cost $29. Still the one I’m least happy with. Cash is thin. Not adding again just because the screen is red. Rockets book. Smaller book. $NBIS 26%. Cost $215. Last $156. $IREN 20%. Cost $51. Last $24. $ASTS 19%. Cost $78. Last $41. $OSCR 14%. Cost $23. $ONDS 11%. Cost $6.7. $CIFR 10%. Cost $18. Last $7. High-beta. They’ll move more than the index both ways. The cut is still whether the megawatts and the network turn into revenue. Not the de-grossing print. xitter.cf/stockswithravi/status/…
Core book portfolio update. $TSLA 34%. Cost $179. $PLTR 14%. Cost $25. $NET 9%. Cost $99. $RKLB 7%. Cost $34. Added under the last print, not under the old average. $SOFI 7%. Cost $11. $TEM 6%. Cost $55. $AMZN 6%. Cost $171. $MSFT 5%. Cost $510. $CBRS 3.6%. Cost $153. Added lower. $NVTS 2.4%. Cost $8. Added. $META 2%. Cost $626. $UPST 2%. Cost $29. Still the one I’m least happy with. $SPCX 0.9%. Cost $129. Trimmed a bit of $COIN. No other exits. Almost no cash. Not adding again just because the screen is red. xitter.cf/stockswithravi/status/…
2
349
What’s moving the tape this weekend: Leopold’s letter, the Jensen return still being digested, and the high-beta AI infrastructure names. $NBIS and $IREN bounced hard after the Friday drop. CoreWeave moved with them. Space is also in the conversation — Neutron orders for $RKLB, catch progress on $SPCX. The bounce and the letter are both the tape. Demand and contracted capacity didn’t disappear. The numbers that didn’t change are still the ones that matter: capacity timing, funding needs, and whether the megawatts or the flights turn into durable cash flow. Core book and rockets book unchanged. Holding.
169
Leopold Aschenbrenner’s Q3 letter is out. Focus is AI agents and superintelligence. Five areas: foundation models, memory chips, GPU rentals, data-center power, robotics. Names that show up: Kioxia, SharonAI, $ANT $SKHY $SNDK $SPCX $NBIS $SHAZ $CRWV $IREN $BE. He also flags that a lot of current software, AI wrappers, and even chip designers can lose the moat once models start doing the engineering work. I own $NBIS and $IREN in the rockets book and $SPCX in the smaller book. The letter is the tape right now. The cut is still the same one on the names I hold: can they turn the contracted megawatts or the launch cadence into cash flow before the financing cost or the delay eats it. Holding. Not adding on the letter.
2
2
302
$SPCX. Added 20 shares at $127. Previous cost was around $134. Last around $133. Starship catch is done. The booster missed the last flight. The cut is whether the catch becomes routine and the cost per flight actually drops. Not one successful recovery. Holding. Not adding more on the tape. The rest of the book didn’t change.
117
Jensen Huang is back as $NVDA CEO. $NBIS up around 29% on the day. $IREN up around 27%. CoreWeave up 20%. I own $NBIS and $IREN in the rockets book. The bounce is the tape. The numbers that didn’t change are the ones that matter. $NBIS still has the Vineland delays and the ~$45B capex need for 2027. $IREN still has the $20B backlog and the funding that has to be raised to deliver it. The demand signal is still there. The cut is the same one. Turn the megawatts into revenue before dilution or the cost of capital eats the upside. A green day doesn’t change that.
240
$DOCN. Average cost still showing $76.17. Last around $70. Added 40 shares at $66.5 on the 20th. The easy story is developer cloud and the AI inference layer. The missing piece is whether growth holds without the margin getting compressed by the bigger cloud players. This name isn’t in the same financing bucket as the neoclouds. The cut is still the same. Can they turn the usage into durable cash flow, or does the price stay tied to the tape. Small on purpose. Holding. Not adding more on the tape.
1
3
246
$CBRS cost $141. Last close $83. Core revenue up 70% to $231M. Cloud up 272%. Q4 guide $310–330M. Three hyperscalers signed in six months. Cloud revenue is guided flat in Q4. Not because demand slowed. Data center capacity is the limit. The Friday move hit everything with leverage. This one still has the same cut. Can the contracted megawatts turn into revenue without the buildout eating the cash flow. Holding. Not adding on the tape.
212
$NBIS and $IREN are up in premarket after last week’s drop. $NBIS closed Friday around $81. $IREN around $12. The bounce is the tape. The numbers that didn’t change are the ones that matter. $NBIS still has the Vineland delays and the ~$45B capex need for 2027. $IREN still has the $20B backlog and the funding that has to be raised to deliver it. I own both in the rockets book. The demand signal is still there. The cut is the same one. Turn the megawatts into revenue before dilution or the cost of capital eats the upside. A green open doesn’t change that.
132
$DOCN. Average cost still showing $76.17. Last $69.74. Added 40 shares at $66.5 on the 20th. The easy story is developer cloud and the AI inference layer. The missing piece is whether growth holds without the margin getting compressed by the bigger cloud players. Friday was a risk-off day. This name isn’t in the same financing bucket as the neoclouds. The cut is still the same. Can they turn the usage into durable cash flow, or does the price stay tied to the tape. Small on purpose. Holding. Not adding more on the tape.
3
236
$CBRS cost $141. Last around $87. Core revenue up 70% to $231M. Cloud up 272%. Q4 guide $310–330M. Three hyperscalers signed in six months. Cloud revenue is guided flat in Q4. Not because demand slowed. Data center capacity is the limit. The Friday move hit everything with leverage. This one still has the same cut. Can the contracted megawatts turn into revenue without the buildout eating the cash flow. Holding. Not adding on the tape.
2
308
𝐅𝐫𝐢𝐝𝐚𝐲’𝐬 𝐛𝐥𝐨𝐨𝐝𝐛𝐚𝐭𝐡 𝐰𝐚𝐬𝐧’𝐭 𝐚 𝐬𝐮𝐝𝐝𝐞𝐧 𝐜𝐨𝐥𝐥𝐚𝐩𝐬𝐞 𝐢𝐧 𝐀𝐈 𝐝𝐞𝐦𝐚𝐧𝐝. It was a multi-catalyst risk-off event that hit the most leveraged parts of the AI trade hardest. 𝐖𝐡𝐚𝐭 𝐚𝐜𝐭𝐮𝐚𝐥𝐥𝐲 𝐡𝐚𝐩𝐩𝐞𝐧𝐞𝐝: • S&P -3.7%, Nasdaq -5.3% (erased 2026 gains). Worst week for Nasdaq in a long time. • Anthropic’s record IPO failed to revive the AI narrative - the stock itself fell ~9% on day 2. • Nvidia dropped ~14% on leadership uncertainty (Jensen Huang exit) + reports of an SEC accounting probe. That spilled into chips, neoclouds, and anything AI-adjacent. • Neoclouds got crushed: NBIS ~-16%, IREN and CoreWeave double-digit drops. • Michael Burry’s “I tried to warn you” post on CoreWeave / Nebius / Nvidia added fuel. 𝐓𝐡𝐞 𝐝𝐞𝐞𝐩𝐞𝐫 𝐢𝐬𝐬𝐮𝐞 𝐟𝐨𝐫 𝐧𝐚𝐦𝐞𝐬 𝐥𝐢𝐤𝐞 𝐍𝐁𝐈𝐒 / 𝐈𝐑𝐄𝐍 / 𝐂𝐨𝐫𝐞𝐖𝐞𝐚𝐯𝐞: Recent earnings already flagged third-party capacity delays (timing, not cancellations) and massive CapEx ($27B in 2026, $40–45B guided for 2027). Prepayments help, but the absolute scale of funding needed + any further slippage is what the market is now punishing. Demand and contracted revenue still look intact — the market is questioning execution and financing more than the growth thesis itself. This was 𝐬𝐞𝐧𝐭𝐢𝐦𝐞𝐧𝐭 + 𝐞𝐱𝐞𝐜𝐮𝐭𝐢𝐨𝐧 𝐬𝐤𝐞𝐩𝐭𝐢𝐜𝐢𝐬𝐦 + 𝐛𝐫𝐨𝐚𝐝𝐞𝐫 𝐝𝐞-𝐫𝐢𝐬𝐤𝐢𝐧𝐠, not a demand destruction event. High-beta AI infrastructure names will keep swinging hard until capacity delivery and funding clarity improve. Not financial advice - just the setup. #NBIS #IREN #CoreWeave #AIStocks #Neocloud #StockMarket
1
70
$RKLB is in the core book. Cost $37. Last around $55. 100th Electron is done. The next 100 are already booked. Space Systems carried the last quarter. Neutron is still 2027. Holding. Not adding on the tape. The cut is whether the cadence turns into the backlog and the margin once Neutron is flying. Not the launch count by itself. The rest of the book didn’t change.
86
$NBIS is in the rockets book. Down again today. The demand signal is still there. GPU pricing on new contracts is up more than 20% sequentially. Prepayments on new deals now cover more than 100% of the associated capex. The selloff is about delivery and capital. Vineland delays. The ~$45B capex need for 2027. The market is asking whether the capacity shows up on time without constant dilution. Holding. Not averaging down just because the price is lower. The cut is the same one. Turn the megawatts into revenue before the cost of capital eats the upside.
89
Market closed lower. S&P -2%, Nasdaq -2.25%. VIX up. Anthropic debuted and the AI names sold off with it. $CBRS is in the core book. Cost $141. Last around $87–95. Core revenue up 70% to $231M. Cloud up 272%. Q4 guide $310–330M. Three hyperscalers in six months. Holding. Not adding. The growth is real. The cut is whether the contracted megawatts turn into revenue without the buildout eating the cash flow. A down day doesn’t change that.
190
Colette Kress said leading software and security companies announced products built on post-trained open models this quarter. Microsoft $MSFT, Salesforce $CRM, Palantir $PLTR, CrowdStrike $CRWD, Cadence $CDNS and Synopsys $SNPS. Training partners like Scale, Prime Intellect and Applied Compute are helping enterprises tailor open models to their own data. Abridge is using them in healthcare. I own $PLTR. Cost $25. Last $157. The open-model list is the distribution. The part I’m watching is whether that turns into paid usage on the platforms that already sit in the workflow, or whether it stays a feature that gets bundled in. The GPU print is the demand. The open-model adoption is the next layer. That’s the part I’d want to hear more on.
188
Nvidia Chair said the board does not intend to reinstate Huang. Data center lease commitments and cloud service agreements are now $102B, up from $74B last quarter. Upcoming leases run up to 20 years. Still no China Data Center compute revenue in the outlook. Commerce Department change would block the chips from being rented to Chinese companies entirely. I don’t own $NVDA. The $102B in lease commitments is the capacity still being locked in. The China restriction is the part that didn’t change with the print. That’s the overhang I’m still watching.
83
$NVDA call is on. Colette Kress is interim CEO. From the release and early comments: roadmap is on track. Vera Rubin NVL72 has shipped. “Our momentum is real.” Gross margin dip sequential is from ramping Rubin production. Q4 guide $130B, no China Data Center compute revenue assumed. I don’t own the stock. The print is the demand. The numbers show the spend is still happening. $CBRS just printed 70% core revenue growth and a Microsoft deal. $NBIS and $IREN are in the rockets book. The GPU is the capacity. The part I’m watching is who gets paid for the power and the inference once it has to run. Holding the names I already own. Not adding $NVDA on the beat. I’ll update if something specific comes off the call.
1
7
72,166
The $18.6B add is the scale. One quarter now bigger than the whole Data Center business was three years ago. I don’t own $NVDA. The print is clean. The part I’m still watching is the lag. How fast does this kind of growth show up in the inference contracts the hyperscalers and neo-clouds already have, or does the capacity just get built further ahead of the actual usage. $CBRS and $NBIS are the names I’m in. The GPU bar is the demand signal. The timing of when that turns into their revenue is the part that still has to show up. That’s what I’d want to hear more on.
106
$NVDA just printed $115.8B revenue, up 103%. Q4 guide $130B. No China compute revenue assumed. $NBIS, $CBRS and $IREN are up after hours. The group is trading the print. I own all three. $CBRS cost $141, last $103. $NBIS and $IREN are in the rockets book. The demand signal is still there. The cut is the same one I’ve been using. Turn the megawatts into revenue before dilution or the cost of capital eats the upside. A strong GPU print can lift the names for a day. It doesn’t change which ones actually get paid. Holding. Not adding on the bounce.
1
413
$NVDA revenue $115.8B, up 103%. Non-GAAP EPS $2.68. Data Center $107.6B, up 110%. Gross margin about 75%. Q4 guide $130B. No China Data Center compute revenue assumed. Vera Rubin NVL72 has shipped. Colette Kress is interim CEO. I don’t own the stock. The print is the demand. The cut is the same one I’ve been using on the book. The leadership change and the China restriction are still the overhang. The numbers show the spend is still happening. $CBRS just printed 70% core revenue growth and a Microsoft deal. $NBIS and $IREN are in the rockets book. The GPU is the capacity. The part I’m watching is who gets paid for the power and the inference once it has to run. Holding the names I already own. Not adding $NVDA on the beat.
193