Sam M' Imaingi retweeted
3409.
You people look here, check the two blades and note a stark contrast between them.
The upper one has a bar code and the lower one lacks one.
Now that is where every doubt starts.
A bar code is not only a sign of authenticity to a brand but also serves as a foundation for digital traceability.
That said, you can easily know the fake one (from the two) - for the fact that it can not be traced anywhere (digitally).
Retweet to help anyone who cares to be concerned.
Sam M' Imaingi retweeted
1/ When I said we are probably the best Local EPC, I forgot to name the Company ARM Engineering. I founded it in 2006 after careers in KPLC 1986-1996 and ABB 1997-2003.
Now I will give an idea of what we do in ARM Engineering.
Sam M' Imaingi retweeted
Replying to @SamMitu4 @citizentvkenya
Technical competence …..then contract administration competence and then Project Management certification natural follows next
The cart should never be put ahead of the horse. You need a project manager that understand technical matters and contractual matters
Sam M' Imaingi retweeted
Replying to @SamMitu4 @mugaa_eric
For sure a lot needs to be done in terms of public education on water. Also this explains why raising water tariff uwa kazi ngumu na at the end it affects service delivery
Sam M' Imaingi retweeted
Replying to @mugaa_eric
Your agencies, especially WASREB, have a lot to do in terms of civic education on water tariffs and charges. The level of ignorance in our population is unmatched.
Sam M' Imaingi retweeted
Replying to @SamMitu4 @mugaa_eric
Nolturesh Water company in badly run Kajiado was taken down by non revenue water. Diverting treated water to Agricultural firms
Do you know bulk water infrast. is often financed by loans from AfDB, World Bank and KfW? Treasury reported KSh137.9bn in water-sector loans outstanding by June 2025. Treatment chemicals, electricity, repairs and staff are recurring operating costs, sir—not propaganda.
The only ignorant person here is you.
The infrastructure is already maintained you slow ass Kenyan.
This water privatization propaganda being planted
1
27
The comments under CS @mugaa_eric's post expose two things: widespread ignorance on water management & failure to understand water supply economics.Water is a basic human right,but treatment,distribution & infrast. maintenance are NOT free. NRW is a serious development challenge.
Dualling is well on course. With commercial financing, the contract is often signed first, then the contractor uses it to approach banks for funding. This is common with Chinese projects, where the contractor helps the government source financing.
You’re unable to view this Post because this account owner limits who can view their Posts. Learn more
The @ppp_kenya has terminated a PIP by Elevolution Engenharia, S.A., Portugal for the Financing, Design, Construction, Operation and Transfer of the Thuci Dam Project under the PPP framework & directed @MOWSI_KE @Irrigation_Auth to consider an alternative procurement route.
2
79
Even with a competent Employer’s Contract Administrator, if the Site Agent doesn’t understand contract administration, you've a recipe for chaos.
These are the people making daily decisions on site. Contract administration shouldn’t be an afterthought in engineering education.
🤖 Made with AI
No wonder @mugaa_eric has been exposing very clueless site agents. A Site Agent is the project’s frontline officer. How do you expect someone struggling with commercial management and economics to prevent cost overruns? We need holistic engineers, not just technical experts.
10
Kenya’s engineering curriculum is overly technical,often at the expense of vital supporting courses: business communication,project economics,commercial management & contract administration.
I’d bet 80% of fresh engineering graduates leave university without a clue what FIDIC is.
🤖 Made with AI
We have a very professional and articulate man for the job in @mugaa_eric .
Hosted World Bank Division Director for Kenya Mr. Qimiao Fan at Mwache Dam for a joint inspection, progress review, forecasted El Niño effects and mitigations and mechanisms to expedite works to completion
66
This is too low of @Milliegeza . You seem not to understand the law that you make. Bulk water and sewerage infrastructure are developed by national gov't thr' various agencies & thereafter handed over to utility companies. So the CS can't call out poor operation of such?
" I did not like the way Water CS was talking to Homabay Governor Gladys Wanga, "- MP Millie Odhiambo!
1
104
The president H.E @WilliamsRuto might have had several misses, but not in the appointment of Eng. @mugaa_eric . Engineers are happy.
CS Eric Mugaa understands his work so well that Wanga’s facial expression kept changing as Engineer kept asking the quack contractor questions. This is what the Constitution envisioned when it says CSs shouldn't be politicians but professionals. Ruto would've probably said kudos.
3
78
Sam M' Imaingi retweeted
At an estimated cost of KSh 38.841 billion, China Communications Construction Company (CCCC) will design, construct & finance the Athi Dam & Associated Irrigation Water Conveyance System along the Galana River to supply irrigation water to the Galana-Kulalu Food Security Project.
At an estimated cost of KSh 38.841 billion, China Communications Construction Company (CCCC) will design, construct & finance the Athi Dam & Associated Irrigation Water Conveyance System along the Galana River to supply irrigation water to the Galana-Kulalu Food Security Project.
Because the project lies within Tsavo East National Park, the canal incorporates wildlife protection measures, including:
• 1.05 m quarry stone aggregate buffer
• Solar-powered electric fence
• 5 wildlife overpasses (100 m each)
• 2 wildlife drinking pools
1
1
28