NDF - India’s Infrastructure Growth (@NDF_infra) header
NDF - India’s Infrastructure Growth (@NDF_infra) profile picture

Decoding a rising India through infrastructure, connectivity, industrial growth & strategic progress. Tracking the transformation shaping Viksit Bharat by NDF

Joined November 2026
Photo by NDF - India’s Infrastructure Growth (@NDF_infra)Photo by NDF - India’s Infrastructure Growth (@NDF_infra)Photo by NDF - India’s Infrastructure Growth (@NDF_infra)Photo by NDF - India’s Infrastructure Growth (@NDF_infra)Photo by NDF - India’s Infrastructure Growth (@NDF_infra)Photo by NDF - India’s Infrastructure Growth (@NDF_infra)Photo by NDF - India’s Infrastructure Growth (@NDF_infra)Photo by NDF - India’s Infrastructure Growth (@NDF_infra)Photo by NDF - India’s Infrastructure Growth (@NDF_infra)Photo by NDF - India’s Infrastructure Growth (@NDF_infra)
Introducing NDF – India’s Infrastructure Growth India’s growth story is being powered by strategic infrastructure, indigenous manufacturing & global ambition. Follow us for the milestones shaping a stronger, future-ready India! #Infrastructure #IndiaGrowth #AtmanirbharBharat
1
6
1
15
849
A quick look at West Bengal's highway push this week. Two key links are now open; new corridors and road widening projects have been announced, and 59 accident black spots are set to be fixed across the state. @MORTHIndia @NHAI_Official #WestBengal #Highways
5
116
The Cabinet has approved an India-Singapore agreement on aircraft maintenance, repair and overhaul. It covers joint training for aircraft maintenance engineers and support for more MRO facilities in India, to cut reliance on overseas maintenance. @MoCA_GoI #Aviation #MRO
1
2
5
84
NHAI will now ensure ambulances, patrol vehicles and tow-away cranes are in place before any new national highway stretch opens to traffic. They will be linked to the 1033 highway helpline, police, fire services and hospitals. @NHAI_Official #RoadSafety #Highways
4
154
Two more highway corridors have been announced for West Bengal. A 245-km, four-lane Moregram-Kishanganj high-speed corridor will cost ₹12,000 crore, and a 75-km Barasat-Petrapole highway ₹8,000 crore, linking towards the Bangladesh border. @MORTHIndia #Highways #WestBengal
6
93
The overhead power lines on part of the Surat-Bilimora section of the Mumbai-Ahmedabad bullet train corridor are now energised. The Railway Minister has said trial runs on the 50-km section are expected from May 2027. @nhsrcl @RailMinIndia #BulletTrain #HighSpeedRail
1
5
306
The Centre is now monitoring 1,862 infrastructure projects worth ₹38.11 lakh crore, as of October 2026. About ₹17.87 lakh crore, nearly 47% of their cost, has been spent so far, with transport and energy making up most of the projects. #Infrastructure #IndiaGrowth
1
6
307
Bihar has approved ₹706.51 crore to acquire about 1,294 acres for new industrial areas in Nalanda, Samastipur and Sheikhpura districts. #Industry #Bihar #IndustrialGrowth
1
9
321
Bihar has approved ₹1,794.32 crore to supply piped water to 2,18,585 households across 75 wards of Patna under AMRUT 2.0. A ₹1,347.32-crore Son River drinking water project will also serve Aurangabad, Dehri and Sasaram. @MoHUA_India #WaterInfra #Bihar
3
11
460
India's finished steel consumption rose 7.5% to 99.4 million tonnes in April to October 2026. Crude steel output grew 2.6% to 99.2 million tonnes over the same period. @SteelMinIndia #Steel #IndiaGrowth
4
51
A 250-km, ₹14,000-crore Kolkata Ring Road is among the highway projects announced for West Bengal. It is part of a ₹75,000-crore road pipeline that also includes a 58-km, eight-lane Dankuni-Kolaghat corridor. @MORTHIndia #Kolkata #Highways #WestBengal
3
10
497
22 national highway projects worth over ₹8,700 crore have been opened or started in West Bengal. The six-lane, 63.83-km Palsit-Dankuni stretch of NH-19 and a ₹521.20-crore four-lane Ganga bridge at Farakka are now open. @MORTHIndia @NHAI_Official #Highways #WestBengal
5
152
Six new urea plants have been approved under the National Investment Policy for Urea 2026, with an investment of about ₹54,000 crore. Each will have a capacity of 12.7 lakh tonnes a year, as India works towards self-reliance in urea. #Fertilizers #AatmanirbharBharat
4
57
Four Indian Army aircraft have landed and taken off on the Amritsar-Jamnagar Economic Corridor (NH-754A) in Patan, Gujarat. The demonstration showed how well-built highway stretches can support emergency and strategic needs. @NHAI_Official @MORTHIndia #Highways #IndianArmy
2
8
105
The Cabinet has approved an ₹11,000-crore scheme to grow India's construction and infrastructure equipment manufacturing. It covers machines such as tunnel boring machines, ship-to-shore cranes and hydraulic excavators. @MHI_GoI #MakeInIndia #Infrastructure
1
6
80
The Cabinet has approved a ₹4,288.26-crore second container terminal at Kamarajar Port, Chennai, under a public-private partnership. The 900-m terminal will add 2 million TEUs a year and handle ships of up to 24,346 TEUs. @shipmin_india #Ports #MaritimeIndia
6
60
The Cabinet has approved a ₹2,014-crore greenfield airport at Doloo near Silchar in Assam, to be built by the Airports Authority of India. It will have a 2,705-m runway for A320 aircraft and a terminal for 800 peak-hour passengers. @AAI_Official #Aviation #Assam
2
7
116
Unit 1 of the Kaiga nuclear plant in Karnataka has reached criticality again, 600 days after it was shut down to replace its coolant channels and feeders. NPCIL says no other reactor in its fleet has returned this quickly after such work. @DAEIndia #NuclearEnergy #Karnataka
3
11
419
India's fourth indigenous 700 MWe nuclear reactor, RAPP-8 at Rawatbhata in Rajasthan, has been cleared by the Atomic Energy Regulatory Board for its first approach to criticality. The step moves it closer to generating power. @DAEIndia #NuclearEnergy #Rajasthan
4
63
ONE LINE UNDER CONSTRUCTION. MORE ROUTES APPROVED. 1/5 India's high-speed rail plans now extend well beyond the Mumbai-Ahmedabad route. A look at the line being built, the routes announced, and those approved since. @nhsrcl @RailMinIndia #BulletTrain #HighSpeedRail
1
1
8
167
2/5 The 508-km Mumbai-Ahmedabad line uses Japan's Shinkansen technology, with loans from the Japan International Cooperation Agency (JICA). By September 2026, 371 km of viaduct was ready. Gujarat's portion is due by December 2027, the full line by 2029. #BulletTrain #Gujarat
1
2
5
90