🚀 Building software for data centers @Aravolta_X25
San Francisco, California
Joined May 2022
- Tweets371
- Following840
- Followers1.7K
- Likes830
He is right. Look up the 100 MW of ready capacity in Santa Clara sitting unused for years waiting for the power connection to be completed.
Everything is in there but nothing is switched on. They can’t be used for much else in the meantime … what a waste.
Replying to @Yuchenj_UW
I think we’re going to see a lot of stranded compute in partially complete data centers
❤️
i sleep well at night staring at telemetry data from our B300 nodes in my @Aravolta_X25 dashboard (and our lender does too)
4
725
AI Data Centers are hard, we’ve seen UPS arc flashes, constant leak and humidity issues, thermal overload, and many many other flavors of issues.
Luckily for our customers who had installed @Aravolta_X25 the issues were noticed before they escalated and addressed immediately, no damage to the compute.
This shit takes time, planning, and excellent monitoring.
Yep, one node is handling ~100,000 points per second on average coming out of every data center building and electrical device.
Was amazing working with Nvidia team on this!
1/ our friends at @Aravolta_X25 keep shipping!
with one small node, Aravolta gathers data from the building and electrical systems and publish a complete, checked feed of power and cooling data to the NVIDIA DSX™ Platform
we're happy customers (and proud investors)
This is just one of the use cases of @Aravolta_X25 but it’s huge for GPU lenders and insurance.
Imagine making a car loan without an odometer to know the miles on it. You’re flying blind and interest rates need to compensate.
True out of band monitoring of the hardware will enable a lot more financing structures long term.
yep, will continue to iterate further to get more transparency of the books & standards to uphold, while respecting end-user privacy (much like the @Aravolta_X25 solution)
2
313
Thanks @HotAisle
One area that I didn't predict or understand is the need for 3rd party validation of compute. In other words, say you take a loan from USD.ai and then deploy out compute. How is it validated that that compute is online and servicing customers? Companies like @Aravolta_X25 confused me at first, but now I'm seeing the use case. Good work @Marg_Groisman for identifying that need and building that product.
1
7
855
More than 100 Aravolta Nodes deployed now, 8 countries.
I've been silent but we've had unprecedented growth at Aravolta.
Have 57+ of these guys deployed in data centers across 6 countries.
Everyone and their mom is trying to get into the data center game.
We are the new Schneider Electric, offering an all in one power, building and IT control and monitoring.
Hiring urgently for forward deployed engineers.
More coming soon.
6
567
Companies only have 2 jobs.
1) Build the thing.
2) Sell the thing.
Everything else is playing status games.
I've been silent but we've had unprecedented growth at Aravolta.
Have 57+ of these guys deployed in data centers across 6 countries.
Everyone and their mom is trying to get into the data center game.
We are the new Schneider Electric, offering an all in one power, building and IT control and monitoring.
Hiring urgently for forward deployed engineers.
More coming soon.
Margarita G retweeted
USDAI does not lend against promises.
It lends against installed, verified, cash-generating GPUs.
@0xZergs breaks down USDAI’s underwriting and risk management process on the @Decentralisedco podcast.
Margarita G retweeted
narrative violation: the world's largest data center consumes roughly the same amount of fresh water per year as two 18-hole golf courses
great insights from @Aravolta_X25 on the environmental impact of data centers
aravolta.com/blog/the-real-e…
Margarita G retweeted
Excited to be working with @USDai_Official.
GPU-backed credit only works if collateral can be continuously verified.
@Aravolta_X25 provides real-time, infrastructure-level verification so GPUs used as collateral are installed, operational, and auditable, without touching customer workloads.
USD.AI is pioneering GPU-backed financing built on real, infrastructure-level data.
Verify, don’t trust.
VERIFY, DON'T TRUST: USDAI is partnering with @Aravolta_X25 to support GPU-backed credit positions.
Their real-time analytics will be used to validate that collateralized GPUs are installed and operational.
So incredibly excited to be working with @USDai_Official.
We put out a thesis that credit providers needed real GPU analytics - applying the principle of trust, but verify.
Today, that partnership is live, and fully supported by @Aravolta_X25 technology.
Thank you to the team at @USDai_official. If you are looking for financing for GPUs, these are the guys to talk to. We’ll be under the hood, powering verification and trust in the industry.
VERIFY, DON'T TRUST: USDAI is partnering with @Aravolta_X25 to support GPU-backed credit positions.
Their real-time analytics will be used to validate that collateralized GPUs are installed and operational.
6
711
Margarita G retweeted
VERIFY, DON'T TRUST: USDAI is partnering with @Aravolta_X25 to support GPU-backed credit positions.
Their real-time analytics will be used to validate that collateralized GPUs are installed and operational.
Margarita G retweeted
Aravolta raised $5.1 million to build software that helps operators manage the growing complexity of AI-driven, GPU-heavy data center infrastructure. @Aravolta_X25
HostingJournalist.com/news/a…
There’s a debate happening right now about how long GPUs actually last.
CoreWeave models ~ 6 years of useful economic life
Nebius says closer to 4 years
Google engineers report 1-3 years under heavy datacenter workloads
And Michael Burry argues the whole market pops long before year 6 ever arrives.
The problem to me is that they are using averages - which hides the real data and real usage scenarios.
GPUs don’t age due to time. They age by behavior.
This means that two identical B300s can have completely different economic lives:
Result: A fleet's effective depreciation curve varied by 30–45% across different end-customers, even though the GPUs were identical models. In other words, certain customer workloads drove their hardware to lose value almost twice as fast than others.
And this is exactly where lenders, investors, and operators get blindsided:
- Mispriced salvage assumptions
- Over - or under-collateralized deals
- Loan terms that break halfway through
- Portfolios that suddenly don’t pencil
Telemetry is the new underwriting.
one of the most important questions in GPU financing is the rate of depreciation
every investor and firm has been modeling different useful lifespan for GPUs - as low as 3 years and as high as 7 years
but what is the actual number?
@Aravolta_X25 has the data 👇