GT Electrics Ltd MIET (@GTE55) header
GT Electrics Ltd MIET (@GTE55) profile picture

Electrical contractor Industrial, Commercial, Domestic, AV, Home Control, based in Hertfordshire ECA ELECSA Part P MIET HNC Electrical Engineering

welwyn garden city
Joined April 2011
Photo by GT Electrics Ltd MIET (@GTE55)Photo by GT Electrics Ltd MIET (@GTE55)Photo by GT Electrics Ltd MIET (@GTE55)Photo by GT Electrics Ltd MIET (@GTE55)Photo by GT Electrics Ltd MIET (@GTE55)Photo by GT Electrics Ltd MIET (@GTE55)Photo by GT Electrics Ltd MIET (@GTE55)Photo by GT Electrics Ltd MIET (@GTE55)Photo by GT Electrics Ltd MIET (@GTE55)Photo by GT Electrics Ltd MIET (@GTE55)
Been busy in Central London with some high level containment and fit out of a unit. Switchgear and changeover switch rated at 250A to allow for future expansion #containment #cabletray #fibreraceway #MEWPs
1
2
196
What have I been up to today?
1
8
399
GT Electrics Ltd MIET retweeted
Thank you to our partners, business associates, customers and team for making this another fantastic year. Here’s to continuing our innovation in the mobile telecoms space and exceeding expectations for our customers, old and new, in 2025. Merry Christmas and a Happy New Year!
1
1
1
201
Swapped out DALI flu fittings in the chemistry lab and fitted COLLINGWOOD 4000k DALI LED strips. Anyone need these old drivers?
171
Telecom room fit out 250A three phase nearly finished, containment ladder and cable tray, power and interlocked Gewiss socket. lighting. Schneider panel board with metering to 10 circuits via Rayleigh instruments. @SchneiderUKI @UnitrunkRIS @gewiss_uk
2
1
11
502
Helvar commercial dimmer upgrade at a church, pryo moved and reconnected. New LED compatible dimming system being fitted. #pyro #dimmers @Helvar_Lighting
2
234
4th floodlight column fitted and wired in last night @FinchleyRFC this allows all year round training for the club.
1
3
264
Anyone know of a company that would clean a large solar array- 240 panels on a barn roof, in Hertfordshire?
1
1
339
New generator installation to supply 2 x 100A three phase supplies into a large property with ATS on each supply. Cabling in, ATS and external panel board in a stainless steel enclosure next.
1
7
386
Busy day pulling in a few. 50mm 4c, 3 x 6mm 3c, 4mm 5c and 35mm earth in one hit. #swa #undergroundduct #cablepulling #sorearms
5
269
Lighting upgrade, 140 x T5 fluorescent fittings out and @collingwoodLED 30W LED panels in. 3300W less consumption and over 50% increase in light levels.
1
6
429
Belsize Park 12.15 lunchtime van broken into Packout boxes taken , drills, lasers, loads gone. Literally 1-2mins as we heard the alarm go off. Black car, 2 blokes baseball caps.@Stolentools_
4
1
3
733
Don’t let domestic sparks play with stuff they don’t know about, this flex is running a three phase supply, cover open and everything exposed - found it like this! GY is L2, other flex has N only, G/Y cut out. – at Hatfield, East
6
1
10
1,195
Astro floodlighting installation we completed a while back but now the video is out, looks great. ⁦@gewiss_uk⁩ floodlights and lighting design tucked all the boxes. linkedin.com/posts/paul-m-54…
1
164
Factory EICR, overhead 300A busbar with open tap off positions and no blank plates fitted in a metal store where they are handling 4M long metalwork. C2?! Blank plates fitted on them all straight away. – at Hatfield, East
3
3
565
A little bit overrated for the 4mm SY on this factory EICR – at Hatfield, East
1
3
267
Thank you @RFSolutionsLtd for the chocolate tool kit prize, they look so realistic can’t wait to drill into them and wrench them out of the box #choccytreats
1
3
327
Just found some brand new boxes of @Wago 221-413 3 ways with a mixture of 2 and 3 ways, batch code- last 4 digits 1356. Check your stock
1
1
3
281
Pryo tracing/fault finding day at the church, mixture of 2c, 5c and 7c – at Barnet, London
1
1
5
394
Today consisted of trying to test this old Helvar three phase dimming panel and trace cable faults on the pyros, shared neutrals, mixed phases. Being swapped to a @Lutron @Lutron_EU Homework’s panel so need discrete circuits or the RCBOs won’t hold in. Next - tower at high level – at Barnet, London
4
317