
ALT Screenshot of Page 2 from the ORR report "Rail delay compensation claims, rail periods 1 to 4 (1 April to 25 July 2026)". Key Text Summary: Total claims closed across operators reached 3.8 million (up 55% on the previous year). 22 operators saw an increase in claims, led by LNER (up 125%). Figure 1.1 Bar Chart Data: Shows "Volume of delay compensation claims closed by operator, rail periods 1 to 4 and change compared with the same rail periods in the previous year (Table 4410)". Highlights include: South Western Railway: 353,024 claims closed (+85% change, ranked 22nd out of 25 operators). Great Western Railway: 549,707 claims closed (+52% change). Elizabeth Line: 8,155 claims closed (+89% change). East Midlands Railway: 238,897 claims closed (+115% change). London North Eastern Railway: 278,065 claims closed (+125% change).




























