Visit cutstruct.com to order construction materials in bulk.
#cutstruct #cutstructtechnology #constructionindustry #constructionmaterials #buildingmaterial #realestate
The gauge of your roofing sheet matters more than the color. Lagos wind does not care about aesthetics. What gauge did you use for your last project?
Happy New Month!
After 30 | Saka | Agent Tank
Procurement is the most "leaking" part of any construction budget. If you don't have a data-backed sourcing plan, you are losing money.
What’s your biggest "money pit" on site?
GM GM | Dele | Legend
Catch our CEO, John Oamen, live on stage this week! This is a conversation you cannot afford to miss. nigeriamegaproject.com/landi…
#Cutstruct #NigeriaMegaProject #BuildExpo2026 GM GM
Before you chase funding, know where your project stands.
Pre-screen your construction project today.
Visit apply.cutstruct.com to get started.
Dear HR | Rain | Summerville | Rashford | NYSC | Anna | AFCON | Carrick | Morocco | Adeboye
Bulk buying is the only way to survive high inflation. But where do you store 500 bags of cement safely? This is the dilemma of the small-scale developer.
Kwankwaso | Mark Angel | #June2026 | Fayose | Forest Guards
Read the complete report on how we are transforming project execution across the continent: guardian.ng/specials/special……
Fayose | Kwankwaso | #June2026 | Mark Angel | Forest Guards | Happy New Month
A project is only as strong as the team powering it. We celebrate the dedication of the individuals who work tirelessly to ensure transparency and quality for every builder.
President of Nigeria | Ondo State | Cuppy | Mama Deola | Northerner
Cutstruct Technology retweeted
𝐅𝐨𝐮𝐫 𝐞𝐱𝐭𝐞𝐫𝐧𝐚𝐥 𝐰𝐨𝐫𝐤𝐬 𝐩𝐞𝐨𝐩𝐥𝐞 𝐟𝐨𝐫𝐠𝐞𝐭 𝐭𝐨 𝐛𝐮𝐝𝐠𝐞𝐭 𝐟𝐨𝐫
Many people think once the house is roofed and painted, they are almost done.
That is where another round of spending starts.
External works can quietly take serious money if you don’t plan for them early.
These are the ones people forget the most.
1. Drainage around the building
Water must have where to go.
If you don’t plan drainage, rainwater will gather around your house.
That is how you start seeing:
Waterlogged compound
Stained walls
Foundation weakening over time
Proper drainage is not decoration.
It is protection.
And it takes concrete, labour and planning.
2. Interlocking / concrete flooring
Bare ground around a finished house quickly becomes a problem.
Mud everywhere during rain.
Dust everywhere during dry season.
So you start thinking of interlock or concrete flooring.
That is when you realize it is not cheap.
From hardcore filling to sand blinding to laying… it adds up fast.
Many people didn’t plan it, so it now delays completion.
3. Fencing and gate
Security is not optional.
But fencing a plot is not small money.
Blocks, concrete, pillars, gate, labour.
If you leave it out of your budget, you will feel it.
Some people even finish a house and cannot move in because fencing is not ready.
That is how important it is.
4. Septic tank and soakaway
This one surprises a lot of people.
Waste system is part of the building, but many don’t budget for it early.
Excavation, blockwork, concrete cover, plumbing connection.
Depending on size and soil condition, this can take serious money.
And without it, the house is not functional.
The truth is this:
A building is not complete when the structure stands.
It is complete when the environment around it works.
If you don’t plan external works, they will meet you later… and they are not cheap.
Be honest, which of these did you already plan for… and which one are you just realizing now?
© Godwin Ohiochioya
We’ve noticed a trend: People are stalling projects hoping prices will drop. History shows that in Nigeria, "the best time to buy was yesterday." Are you waiting or buying?
Lagosians | House of Representatives | Aisha Achimugu | Bybit | Melania Trump
Tech is finally hitting the Nigerian site. From drone surveys to digital procurement. Do you think our local artisans are ready for a tech-driven industry?
Aisha Achimugu | David Adeyanju | Bybit | House of Representatives
Unpopular Opinion: It is cheaper to hire an expensive professional than a "cheap" amateur. The amateur will make you pay twice. Agree?
Obafemi Awolowo University | Best International Act | Maiduguri
The "Certainty" we talk about at Cutstruct isn't just a slogan. It’s about knowing that when you pay for 16mm, you get 16mm. Why is this so hard for traditional vendors to do?
Touching | First Class | Laundy #NewNigeria
Join our VP of Construction Finance, Dr. Ulohomuno Eze Afieroho, and industry leaders from @ULawsocial and SPACECUBE tomorrow as they break down how to structure compliant projects in a digitised landscape.
Register here: uubo.org/event
Arise TV | Sowore | Senate
Most "market stories" happen because there is no paper trail. We’ve moved the entire procurement process online so you can track every Naira and every delivery. Transparency shouldn’t be a luxury. See how it works: cutstruct.com
Swalwell | Gm Joseph | Yayi | DJ Cuppy
Replying to @RIVEN893
Hello! You can order quality building materials from us. Test us!
Don't let 'Celebrity Quotes' mislead you into a structural disaster. Building is expensive because quality is non-negotiable.
Want to know the real cost of verified materials for a structure like this?
Visit cutstruct.com and get the facts.
This is the break down of this four bedroom house.
(1) Roofing #5,5000,000
(2) Pop= #2,500,000
(3) Window= #1,7000,000
(5) Chipping 55tons= #1,400,000
(6) Sharp sand= 6 trip= #480,000
(7) Red mud 4trip= #160,000
(8) Binding wire 3= #108,000
(9)Nails=3inches = 2&half= #90,000
(10) Nail= 2inches= 1&half= #53,000
(11) 16mm= 65pcs= #975,000
(12) 12mm= 265pcs= #3,392,000
(13) 10mm= 12pcs= #96,000
(14) 8mm= 50pcs= #200,000
(15) 1*12 board = 200pcs= #600,000
(16) 2*2 poline= 120pcs= #108,000
(17) 2*4= 10pcs= #20,000
(18) Bamboo= 50pcs= #60,000
(20) Cement= 220bags= #2,640,000
(21) Plastering sand= 3trip= #240,000
(22) 1*6 board= 37pcs=#72,000
(23) Labour=# 7000,000
(24) Blocks= 4000pcs=#2,800,000
(25) Doors= #1,400,000
(26) Plumbering work= #1,500,000
TOTAL= #35,000,000
If your contractor says "Oga, this 10mm rod is basically the same as 12mm," please run. Structural integrity isn't a suggestion; it’s physics. We keep the standards high so you can sleep well. See our spec list: cutstruct.com
Mama Pee | Emirates | DJ Chicken
Verification is the new currency. In a market full of fakes, the person who can prove their material quality is king. Choose cutstruct.com everyday, because we can prove it.
Beating | Dj Obi | Bizzle | President of the United States | Kanye West | African Giant
The Nigerian construction industry has been "analog" for too long. We believe that technology can fix the trust gap between developers and suppliers. Certainty is the goal. Join the movement: cutstruct.com
El Clásico | Phyno | Easter Sunday | Vance











