Roscosmos has paused Friday’s structural repair efforts inside the Zvezda service module transfer tunnel, known as PrK, as more measurements and data is assessed. Given this development, NASA has instructed the crew members inside the Dragon spacecraft to end the safe haven procedures and return to planned operations aboard the International Space Station. We look forward to working with Roscosmos on a collaborative approach to address the leaks.
The Zvezda service module transfer tunnel, known as PrK, has suffered from cracks and leaks for some time, and has been mitigated by Roscosmos as much as possible to date. The cracks have always been a concern that NASA watches very closely. NASA and Roscosmos have been working to determine the root cause of the cracks, and Roscosmos manages the issue through operational mitigation measures and periodic partial-repair efforts.
Following new leaks, Roscosmos has elected to proceed with a more extensive repair operation on Friday, June 5. Out of an abundance of caution, NASA has directed all four of the agency's SpaceX Crew-12 members and NASA astronaut Chris Williams to assume an elevated safety posture in the Dragon spacecraft while the repair is underway.
We continue to work with our Russian counterparts, along with the rest of the international community that supports the space station, to arrive at a more permanent resolution.
Cosmic Chicago retweeted
NG-3 Update: We have confirmed payload separation. AST SpaceMobile has confirmed the satellite has powered on. The payload was placed into an off-nominal orbit. We are currently assessing and will update when we have more detailed information.
Cosmic Chicago retweeted
Second stage engine cutoff confirmed. New Glenn’s second stage and payload are now in orbit.
Cosmic Chicago retweeted
New Glenn’s first main engine cut-off and stage separation both confirmed! The booster will begin coasting for approximately four minutes. Coming up, second stage ignition.
Cosmic Chicago retweeted
LIFTOFF! New Glenn clears the tower at LC-36, carrying @AST_SpaceMobile’s BlueBird 7 satellite.
Cosmic Chicago retweeted
LIVE NOW: Tune in to watch the NG-3 webcast!
xitter.cf/i/broadcasts/1nxnRYyVm…
Cosmic Chicago retweeted
Today's New Glenn launch window opens at 6:45 a.m. EDT/10:45 UTC. Join us for the webcast beginning 30 minutes before launch at BlueOrigin.com/Live.
Cosmic Chicago retweeted
The astronauts. Their ride around the Moon.
The Artemis II astronauts pose for a group photo after viewing their Orion spacecraft — which they named Integrity — in the well deck of USS John P. Murtha following their splashdown.

ALT NASA astronauts Reid Wiseman, commander; left, Christina Koch, mission specialist; CSA (Canadian Space Agency) astronaut Jeremy Hansen, mission specialist; and NASA astronaut Victor Glover, Artemis II pilot, right, pose for a group photo after viewing the Orion spacecraft in the well deck of USS John P. Murtha, Saturday, April 11, 2026, in the Pacific Ocean off the coast of California. Credit: NASA/Bill Ingalls
Artemis II may have splashed down, but our photos and videos from the mission are still rolling in! Keep an eye on the latest: nasa.gov/artemis-ii-multimed…










