Can interregional transmission solve our grid's resource adequacy challenges?⚡️
In our new paper, my co-authors and I analyzed 9 years of peak demand and power flow data (2016–2024) across 18 U.S. transmission regions.
iopscience.iop.org/article/1…
Key findings 🧵👇
EMP at Berkeley Lab retweeted
The @ENERGY Office of Science's facilities make our world-leading scientific research possible.
Join a virtual town hall on Sept. 17 to give input on the future of these facilities: web.cvent.com/event/581984eb…
EMP at Berkeley Lab retweeted
Innovation requires researchers ready to tackle big challenges. Our Graduate Student Research program is accepting applications for U.S. grad students to conduct part of their research at an @ENERGY DOE National Lab or site.
In case you missed it, a recording of last week's webinar on the generator interconnection queue is now available.
Authors presented the latest findings from the @berkeleylab "Queued Up" data analysis.
emp.lbl.gov/queued-2026-edit…
TODAY: Join a webinar with the authors of our annual report on the generation interconnection queue -- Queued Up 2026.
Today, Thursday, July 16 at 1pm ET / 10am PT. Register here lbnl.zoom.us/webinar/registe…
The report can be found at emp.lbl.gov/queues.
Our annual report on the generation interconnection queue -- Queued Up 2026 -- can be found at emp.lbl.gov/queues.
Join a webinar with the authors on Thursday, July 16 at 1pm ET / 10am PT. Register here lbnl.zoom.us/webinar/registe…
EMP at Berkeley Lab retweeted
ERCOT's "connect and manage" model has moved non-firm generator interconnection to the center of reform debates. Less examined: most US regions instead offer a non-firm option called Energy Resource Interconnection Service (ERIS). Has it worked?
I’m pleased to share two new companion preprints I co-authored on this topic in my capacity @DukeU with Prof. Dalia Patino-Echeverri, @whgorman, Fredrich Kahrl, Joachim Seel, & @rand_joseph. Together, the papers provide the most comprehensive assessment of ERIS to date: the first statistically robust empirical comparison of ERIS and NRIS outcomes, paired with a systematic review of how ERIS is implemented.
📄 𝐏𝐚𝐩𝐞𝐫 𝟏: 𝐈𝐬 𝐄𝐧𝐞𝐫𝐠𝐲-𝐎𝐧𝐥𝐲 𝐈𝐧𝐭𝐞𝐫𝐜𝐨𝐧𝐧𝐞𝐜𝐭𝐢𝐨𝐧 𝐖𝐨𝐫𝐤𝐢𝐧𝐠? 𝐄𝐦𝐩𝐢𝐫𝐢𝐜𝐚𝐥 𝐄𝐯𝐢𝐝𝐞𝐧𝐜𝐞 𝐟𝐫𝐨𝐦 𝐓𝐰𝐨 𝐃𝐞𝐜𝐚𝐝𝐞𝐬 𝐨𝐟 𝐔.𝐒. 𝐌𝐚𝐫𝐤𝐞𝐭 𝐃𝐚𝐭𝐚
Drawing on a novel dataset of over 4,500 interconnection cost studies and 36,000 interconnection requests, we find that ERIS has not delivered a durable cost or speed advantage. Its historical cost advantage is largely a "threshold effect" that appears only when a project avoids network upgrades altogether. As grid saturation has cut the share of zero-cost ERIS outcomes from roughly 80% to 10%, that advantage has largely evaporated, and developer demand has contracted in step.
🔗 ssrn.com/abstract=6881698
📄 𝐏𝐚𝐩𝐞𝐫 𝟐: 𝐀 𝐑𝐞𝐯𝐢𝐞𝐰 𝐨𝐟 𝐔𝐧𝐢𝐭𝐞𝐝 𝐒𝐭𝐚𝐭𝐞𝐬 𝐄𝐧𝐞𝐫𝐠𝐲-𝐎𝐧𝐥𝐲 𝐆𝐞𝐧𝐞𝐫𝐚𝐭𝐨𝐫 𝐈𝐧𝐭𝐞𝐫𝐜𝐨𝐧𝐧𝐞𝐜𝐭𝐢𝐨𝐧 𝐒𝐞𝐫𝐯𝐢𝐜𝐞 𝐏𝐨𝐥𝐢𝐜𝐲 𝐚𝐧𝐝 𝐂𝐨𝐧𝐬𝐢𝐝𝐞𝐫𝐚𝐭𝐢𝐨𝐧𝐬 𝐟𝐨𝐫 𝐑𝐞𝐟𝐨𝐫𝐦
Reviewing six ISOs and three major vertically integrated utilities, we document wide and often poorly understood variation in study methods, cost allocation, and procurement rules, showing how regions range from managing congestion through real-time operations to triggering network upgrades during interconnection.
🔗 ssrn.com/abstract=6870718
Notably, both papers conclude that the issue is not the concept of energy-only interconnection – which remains economically sound – but how it has been implemented: restrictive study assumptions that require upgrades for congestion that could instead be handled through operational redispatch.
We hope these serve as useful resources as stakeholders and researchers continue to evaluate these issues, and very much welcome feedback!
New data from @BerkeleyLab shows that the massive backlog of generation & storage interconnection requests has shrunk a bit, as reforms and other market factors take effect. See our slide deck, data dashboard, maps, and downloads at emp.lbl.gov/queues.
THREAD!
And the large load interconnection side is just as heated, with the rush to build data centers. See our report, Speed To Power, which explores more than 40 potential solutions for accelerating large load connections. emp.lbl.gov/publications/spe… 9/x
Queued Up 2026 can be found at emp.lbl.gov/queues.
And join a webinar with the authors on July 16 at 1pm ET / 10am PT. Register here lbnl.zoom.us/webinar/registe…. /END
As the interconnection queue gets longer, how can we improve the speed and reliability of connecting new generation and storage? For DOE’s Interconnection Exchange (i2X), we are hosting a webinar series to dive into interconnection study methods. Register: uvig.webex.com/webappng/site…
Join us next Tuesday, June 23, for a webinar on regional study processes in @MISO_energy and @pjminterconnect. Presentations by staff from MISO and PJM, plus Engie and STRATA.
Under the Interconnection Cost Reduction Solutions for Transmission (iCRS-T) Program, @ENERGY is funding 16-30 recipients to help transmission providers model advanced transmission technologies and controls that are currently underutilized. Apply by 6/18.
energywerx.org/opportunities…