61.2% of inspected battery installs were substandard, though only 0.95% were unsafe. Neutral continuity, backup circuits and RCD selection are the critical issues.
Who controls your home battery after commissioning? We compare remote-access permissions across AlphaESS, Fox ESS, GoodWe, Sigenergy, Sungrow and Tesla, including handovers and revoking access.
One peak 30-minute interval can set a household's demand charge for the whole month. We explain the kW vs kWh maths, network rules, and how batteries and load shifting can reduce the risk.
A 250.9 kW solar and 99.8 kWh battery system forecasts 329 MWh a year, 56% used onsite, saving about $41k annually. With 1,733 STCs, payback drops from 6.5 years to just over five.
Solar and battery deposit caps vary widely across Australia, from no limit to 5-10% of contract value. Here’s the state-by-state breakdown, including SA’s pre-rebate exception.
The battery subsidy factor falls from 6.8 to 5.7 on 1 January 2027, cutting a 10 kWh rebate by about $440 at $40 per STC. Faster cuts and means testing are possible but unconfirmed.
Mid-scale solar now gets a fixed five-year STC deeming period, worth up to $248,800 for a 1 MW system. Eligibility depends on total site capacity, and claiming STCs rules out REGOs.
Battery clearances, roof penetrations, switchboard capacity and export limits should be resolved before construction, not at handover. Here’s how to design solar, storage and EV charging into an all-electric new build.
NSW networks are rolling out emergency solar backstop rules, using CSIP-AUS communications for remote curtailment. Unsupported equipment or lost internet may trigger a fixed 1.5 kW export limit.
Partial backup, whole-home backup or none: each affects circuit segregation, inverter limits, surge capacity and usable storage. We break down the three design paths and why the cheapest quote may fail when the grid does.