How do you launch a 470,000 lb tunnel boring machine without a crane?
Meet The Monster.
Designed and built right here in Bastrop, TX, it's a ~140,000 lb vehicle that carries Prufrock and tilts up to 10° to launch it directly into the ground.
No launch shaft. No crane. No concrete pit.
And when Prufrock finishes a tunnel? The Monster retrieves it, gets transported to the next site, and can have the machine ready to launch again in under 24 hours.
The Monster is our 5th iteration on Launch & Retrieval, with our 6th one in design right now!
We're hiring Mechanical and Electrical Engineers at The Boring Company.
DM me if you want to help build machines like this.
Luca retweeted
Prufrock-MB3 is alive in Nashville!
One week of commissioning/close-out, and will be tunneling by end of month. Two of the four grippers are visible on the right, each which push laterally with ~1 million pounds of force.
Prufrock-MB4 then arrives in December and will be tunneling in January.
Yet another machine mining in Nashville. It's like clockwork
Many more to come!
Luca retweeted
Boring Company President Steve Davis says Elon Musk knows the material and price of every part on every Tesla car and SpaceX rocket, and calls him "the best engineer in the world"
“It’s great. I mean, arguably the best engineer in the world. So, why would you not want to work for the best engineer in the world? I can go anecdote after anecdote after anecdote.”
“But I think the one thing that is very visible with Elon is that he knows, as you’ve seen, every minute detail of every single part on every Tesla car, on every SpaceX rocket, and he knows its purpose. And if there is no purpose, it gets deleted.”
“So, he’ll see a part and say, what’s that made of? Oh, it’s A514 steel, 100 ksi yield strength, 50 cents a pound. He’ll know all the numbers and he’ll know why it’s there.”
“And that’s something that’s really important for engineers to do. So, everyone at the Boring Company can walk up and down the boring machine. They know the material of every part, the yield strength of every part, the cost of the material, the cost of the part, the lead time for the part, the supply chain for the part, and that allows you to make good decisions.”
“That sounds super obvious, but I would challenge anyone, even at the company you’re working at. Do you know that for all of the parts? And it’s rare the answer is yes. And for Elon, the answer is unequivocally yes.”
Boring Company President Steve Davis reveals the Boring Company steers its machines with PlayStation controllers instead of $35,000 custom joysticks, from a control room full of gamers
"A typical boring machine company will have these $30,000, $35,000 custom joysticks, and if a button breaks, you have to pay like $2,000 and wait six weeks."
"So we just use PlayStation controllers, which are super cheap, like $100 if that, and they're replaceable. But almost as important is everyone knows how to use them."
"So we live out of our control room, which is a bunch of people playing video games, and they're very, very good at it."
Vegas Loop is a huge asset to the city of Las Vegas. Highly recommend everyone visit and experience it.
Also, awesome website!
The Boring Company's Las Vegas loop currently has 13 stations, with many more on the way.
Active:
• Resorts World
• Encore
• Westgate
• Fontainebleau
• Sahara
• Airport T1
• Airport T3
• Turnberry Towers
• LVCC South
• LVCC West
• LVCC Central
• LVCC Central Plaza
• LVCC Riviera
Opening soon:
• Virgin
• Hughes Center
• 4744 Paradise (by UNLV)
• Renaissance Hotel
• Hyatt Place
• Stirling Club
• The Collective
• And 7 more
In total, Clark County and the City of Las Vegas have approved 68 miles of tunnel and 100+ stations. As many as 1,200 Tesla vehicles will be in the Vegas Loop when it's done. @boringcompany is already building these tunnels at a cost of under $10 million per mile, with a goal of getting down to $3M-$4M/mile.
Luca retweeted
Trillions of 300+ IQ ASI's.
Billions of humanoid robots.
Billions of ASI data centers across the Solar System.
All of this is coming in the near future.
A new civilization. A new phase of human existence. Transcendence.
We will become more technologically advanced than the civilization depicted in Star Trek.
And this will be just the beginning.
Luca retweeted
Meet the Operations Team in the Global Ops Center in Bastrop, TX!
Today, the team is remotely controlling machines in Vegas (tunneling), Nashville (tunneling), and San Antonio (launching)!
Beat the snail!
Luca retweeted
Maybe I should move to Nashville…
This is massive for the city
And a nice opportunity for @boringcompany
Elon Musk’s Boring Company has signed a 40-year agreement with Nashville International Airport, advancing the Music City Loop connection between the airport and downtown.
• The Boring Company will fully fund construction, operations and maintenance, with no capital investment required from the airport authority.
• All-electric underground rides designed to bypass road traffic and make airport trips faster.
• A planned passenger station just 22 feet from the terminal entrance.
• Approximately $343 million in projected airport revenue over a potential 50-year term, including extensions.
• Two machines already tunneling beneath Nashville, with a third preparing to launch.
A major milestone for The Boring Company, and a step closer to a faster, more convenient airport connection for Nashville.
Luca retweeted
The Boring Company and Metropolitan Nashville Airport Authority have signed a 40-year agreement for a Music City Loop station. Great user experience - less than 10 minutes from downtown to a station located 22 feet from the terminal entrance.
Thanks so much to @Fly_Nashville for the great partnership.
Elon Musk’s Boring Company has signed a 40-year agreement with Nashville International Airport, advancing the Music City Loop connection between the airport and downtown.
• The Boring Company will fully fund construction, operations and maintenance, with no capital investment required from the airport authority.
• All-electric underground rides designed to bypass road traffic and make airport trips faster.
• A planned passenger station just 22 feet from the terminal entrance.
• Approximately $343 million in projected airport revenue over a potential 50-year term, including extensions.
• Two machines already tunneling beneath Nashville, with a third preparing to launch.
A major milestone for The Boring Company, and a step closer to a faster, more convenient airport connection for Nashville.
The pace at which TBC ships tunnel boring machines to Nashville is inspiring. Each machine makes the fleet stronger and increases the rate of tunneling.
Excited to see what is yet to come in Nashville!
Nashville, we’re hiring!
Prufrock-MB3 has arrived (the third TBM building Music City Loop), and Prufrock-MB4 arrives in the next 8 weeks.
Come dig with us - Engineering, Ops, Weld, Maintenance, Electrical, Facilities, Safety, and Security.
Hiring Event: Tuesday, November 24
Apply here: boringcompany.com/applynashv…
Luca retweeted
Nashville, we’re hiring!
Prufrock-MB3 has arrived (the third TBM building Music City Loop), and Prufrock-MB4 arrives in the next 8 weeks.
Come dig with us - Engineering, Ops, Weld, Maintenance, Electrical, Facilities, Safety, and Security.
Hiring Event: Tuesday, November 24
Apply here: boringcompany.com/applynashv…
Luca retweeted
“One knew that this spectacle was not the product of inanimate nature, or of luck, that it was unmistakably human - with "human," for once, meaning grandeur - that a purpose and a long, sustained, disciplined effort had gone to achieve this series of moments, and that man was succeeding, succeeding, succeeding!”
Ayn Rand
Apollo 11 🚀