Aethir (@AethirCloud) header
Aethir (@AethirCloud) profile picture

Powering the Future of AI. Building Decentralised Cloud Compute Infrastructure. https://xitter.cf/t.co/0q8024pYbg https://xitter.cf/t.co/9TF9m3zDSE

Global
Joined May 2022
Photo by Aethir (@AethirCloud)Photo by Aethir (@AethirCloud)Photo by Aethir (@AethirCloud)Photo by Aethir (@AethirCloud)Photo by Aethir (@AethirCloud)Photo by Aethir (@AethirCloud)Photo by Aethir (@AethirCloud)Photo by Aethir (@AethirCloud)Photo by Aethir (@AethirCloud)Photo by Aethir (@AethirCloud)
Major ATH tokenomics update: we’re introducing daily ATH burns, funded by a share of network fees. Every burn goes to a public burn address, where tokens are permanently removed from supply. The mechanism goes live in November. We’re also replacing the fixed platform fee with a floating network fee, set by a published formula that reads market conditions. When the market weakens, the fee falls and the share that gets burned rises. Cloud Hosts are protected by design: the fee can never exceed the value of Cloud Host rewards. The underlying host emissions schedule remains unchanged. The update changes the fee mechanism applied around those rewards. A dashboard tracking daily, monthly and cumulative ATH burned will be available in November. Burns that follow real network activity, and you can check every one of them. Read the full announcement below👇
69
85
36
515
342,248
Axe Compute (NASDAQ: AGPU) reported its Q3 2026 earnings. Revenue more than doubled quarter-on-quarter, and the quarter closed in profit. Here’s what Aethir is watching🧵
12
13
1
100
9,920
Signed book: $3.45B+ by late September. Prepayment cash funds each build before deployment. Contract liabilities reached $569.3M at quarter-end, up from $60.8M at the end of Q2. That balance turns into revenue as clusters are delivered.
1
10
728
Axe Compute’s Q3 revenue figures clearly show the growth potential of the prepayments booking model aimed at sustainable compute support for AI innovators across the globe. Full breakdown aethir.com/blog-posts/axe-co…
1
5
715
🏆 TRIBE BOUNTY 2.0 - NEW REWARD UNLOCKED 🎮 GTA VI at Aethir means Grand Tribe Activation. The top winners of BOTH reward pools will receive a copy of GTA 6*. 🟢 Newcomer pool ($300) → top first-time Triber wins GTA 6 🟣 Veteran pool ($700) → top returning Triber wins GTA 6 How to get in the running: 1️⃣ Register on the campaign page aethirteam.athenagent.com/tr… 2️⃣ Post about Aethir on X with #AethirTribe + your referral link 3️⃣ Submit your post URLs aethirteam.athenagent.com/tr… 4️⃣ Earn points and climb your pool's leaderboard ⏰ Campaign runs through Dec 12. The leaderboard is live now: athenagent2team.pages.dev/tr… For more details on Tribe: xitter.cf/AethirCloud/status/212… Join Aethir Discord: discord.com/invite/aethirclo… Let's cook #AethirTribe *Digital copies are subject to platform and regional availability. Winners must provide accurate account region and console information.
Aethir Tribe Bounty 2.0 is live 🛖💚 Double the prize pool. $1,000 up for grabs from Nov 12 to Dec 12. Share your take on Aethir’s latest milestones and include your personal referral link (assigned during signup). When someone joins through it, you earn 10% of their approved points. 🧵
46
16
2
82
8,185
When the grid can’t deliver, the largest AI campuses try to bring their own power. GE Vernova closed Q2 2026 with 116 GW of gas power backlog and slot reservations, with customer conversations stretching to 2032 and beyond. So the workaround for one bottleneck comes with a queue of its own. Aethir ACCELERATE sidesteps the on-site power plant question by planning to build out mid-sized sites for loads existing infrastructure can carry, then filling them with NVIDIA B300 and GB300 clusters of 64 to 256 nodes. The fastest megawatt is the one already on the wire.
1
6
42
1,599
Anthropic is now trading on Nasdaq as ANT. Shares opened at $111.50 after pricing at $83 in an $81.3B IPO, the largest on record. The filing behind it is one of the most detailed public looks at what frontier AI costs to run. What it shows about compute🧵
4
9
2
89
9,960
When demand beats the plan, the gap gets filled at short-term rates. Q3 swung to a $567M operating loss, driven mainly by $5B of short-term compute and $2B of non-cash donation-matching charges. The filing says short-term compute costs significantly more.
1
5
590
That gap is where Aethir works: 430,000+ GPU containers across 94 countries for capacity needed now, and Aethir ACCELERATE is planning to build mid-sized B300 and GB300 data centers in the US and Europe against signed demand.
4
571
Usage-weighted token prices fell roughly 40% between late June and mid-August, per Silicon Data. In July, AI spend per employee at the heaviest-spending 1% of enterprises rose about 49% month over month, per Ramp. Cheaper inference gets used more. Agents, longer contexts, and always-on workflows absorb every price cut and come back for more GPUs. That demand lands on inference, where cost per GPU hour decides what ships. Aethir keeps its fleet at 95%+ utilization and prices inference workloads 40-80% below centralized alternatives. Falling token prices are a demand signal.
3
9
58
1,882
JLL puts the average US wait for a large data center grid connection at four years, and up to seven for a 100 MW hookup in Northern Virginia. The models that need that power ship in quarters. The bigger the load, the further back in the utility queue it lands, and a gigawatt campus asks for the biggest load of all. Aethir ACCELERATE is focused on building mid-sized sites, and smaller power requests have far more places on the grid where they can land. That is how B300 and GB300 clusters go from site selection to live capacity in months. Right-sized load, shorter line.
3
5
1
39
1,821
Axe Compute has over 18,000 NVIDIA B300 GPUs in delivery across four dedicated AI factories in the US and Europe, President Kyle Okamoto said on yesterday’s Q3 earnings call. - Georgia (2,304 GPUs) is in customer acceptance. - Sweden (2,000+) is in commissioning. - Two prepaid US clusters, 9,000+ and 4,600+ GPUs, are in manufacturing and site readiness. The 4,600-GPU cluster is for a customer that came back for twice as many GPUs as its first cluster. “A returning customer doubling down is the best endorsement any infrastructure company can get,” said Okamoto. “Our customers are not shopping for a few hours of compute. They want to reserve dedicated AI factories for years,” president of @AxeCompute, Kyle Okamoto, explained on the Q3 call.
56
13
2
122
9,207
NVIDIA just reported Q3 fiscal 2027: $115.8B in revenue and $2.68 in adjusted EPS, against guidance of $108B, plus or minus 2%. What the quarter says about AI compute demand, and about who actually gets access to it🧵
23
7
67
10,441
Shipped GPUs still need power, sites, and customers before they produce anything. The harder step is turning delivered capacity into live capacity teams can reach. Aethir’s decentralized GPU cloud runs 430,000+ GPU containers across 94 countries, on demand.
1
2
792
Aethir ACCELERATE covers the dedicated side: mid-sized data centers planned in the US and Europe for B300 and GB300 clusters, built against signed demand.
5
751
The Q3 2026 earnings of @AxeCompute have more than doubled quarter-on-quarter, and the quarter closed in profit. Q2 revenue was $3.2M, all from the Access program. Q3: $7.2M in revenue (up 125%, all Access) and $11.5M in net income, or $0.52 per diluted share. Signed book: $3.45B+, including the fully owned Georgia AI Cluster (2,304 B300 GPUs, contracted through 2031). Georgia: the 2,304-GPU B300 cluster is energized with customer acceptance underway, and depreciation on Build equipment starts in Q4. Axe Compute is an infrastructure partner in Aethir ACCELERATE, supporting our plan to deploy mid-sized B300/GB300 sites in the US and Europe. Discover all the details of Axe Compute’s Q3 earnings👇
27
14
2
108
10,783